IAC Assessment: AR0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Aircraft Modification and Maintenance
NAICS n/a
SIC 3721 - Aircraft
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 101,097
Annual Production 120,000 Units
Production Hrs. Annual 4,171
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,415 1,172,626 kWh $0.05
Electricity Demand $43,657 3,408 kW-months/year $12.81
Natural Gas $37,594 7,807 MMBtu $4.82
TOTAL ENERGY COSTS $142,627
RECOMMENDED SAVINGS* $20,085 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,796
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$897
Cost:
$1,340
$455 9,965 $442 35 - - - - $455
9,965
kWh
$442
35
kW-months/year
-
-
Tgal
-
-
lb
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,652
Cost:
$3,285
$3,902 84,994 $3,750 293 - - - - $3,902
84,994
kWh
$3,750
293
kW-months/year
-
-
Tgal
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,945
Cost:
$2,535
$5,161 112,251 $2,784 218 - - - - $5,161
112,251
kWh
$2,784
218
kW-months/year
-
-
Tgal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$390
Cost:
$110
$390 8,793 - - - - - - $390
8,793
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,289
Cost:
$6,000
- - - - - - $2,289 56,000 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$2,289
56,000
lb
06: 3.4151 MINIMIZE WATER USAGE Savings:
$912
Cost:
$10
- - - - $912 263,314 - - -
-
kWh
-
-
kW-months/year
$912
263,314
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$20,085
Cost:
$13,280
$9,908 216,003 $6,976 546 $912 263,314 $2,289 56,000 $9,908
216,003
kWh
$6,976
546
kW-months/year
$912
263,314
Tgal
$2,289
56,000
lb
TOTAL IMPLEMENTED Savings:
$17,796
Cost:
$7,280
$9,908 216,003 $6,976 546 $912 263,314 - - $9,908
216,003
kWh
$6,976
546
kW-months/year
$912
263,314
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)