Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Small Mill Equipment
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 36,000
Annual Production 250 Pieces
Production Hrs. Annual 4,693
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,088 861,958 kWh $0.03
Electricity Demand $34,665 4,461 kW-months/year $7.77
Natural Gas $9,647 2,039 MMBtu $4.73
TOTAL ENERGY COSTS $105,390
RECOMMENDED SAVINGS* $23,678 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,307
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ gal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,611
Cost:
$390
$655 19,343 $956 68 - - - - $655
19,343
kWh
$956
68
kW-months/year
-
-
gal
-
-
lb
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,248
Cost:
$6,802
$2,060 60,668 $2,188 156 - - - - $2,060
60,668
kWh
$2,188
156
kW-months/year
-
-
gal
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$697
Cost:
$1,330
$239 7,034 $458 33 - - - - $239
7,034
kWh
$458
33
kW-months/year
-
-
gal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$147
Cost:
$60
$72 1,758 $75 5 - - - - $72
1,758
kWh
$75
5
kW-months/year
-
-
gal
-
-
lb
05: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$234
Cost:
$30
$234 6,741 - - - - - - $234
6,741
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,760
Cost:
$6,000
- - - - - - $3,760 67,200 -
-
kWh
-
-
kW-months/year
-
-
gal
$3,760
67,200
lb
07: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$12,981
Cost:
$6,000
- - - - $12,981 1,856 - - -
-
kWh
-
-
kW-months/year
$12,981
1,856
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$23,678
Cost:
$20,612
$3,260 95,544 $3,677 262 $12,981 1,856 $3,760 67,200 $3,260
95,544
kWh
$3,677
262
kW-months/year
$12,981
1,856
gal
$3,760
67,200
lb
TOTAL IMPLEMENTED Savings:
$18,307
Cost:
$14,222
$2,605 76,201 $2,721 194 $12,981 1,856 - - $2,605
76,201
kWh
$2,721
194
kW-months/year
$12,981
1,856
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)