IAC logo
IAC Assessment: AR0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Wood Furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 102,500
Annual Production 75,000 Pieces
Production Hrs. Annual 4,484
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,076 14,097,597 kWh $0.02
Electricity Demand $414,002 21,923 kW-months/year $18.88
Natural Gas $34,655 8,892 MMBtu $3.90
TOTAL ENERGY COSTS $800,183
RECOMMENDED SAVINGS* $98,433 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,807
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,660
Cost:
$520
$7,955 99,648 $705 190 - - - - - - $7,955
99,648
kWh
$705
190
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,364
Cost:
$100
$2,100 26,671 $264 71 - - - - - - $2,100
26,671
kWh
$264
71
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,179
Cost:
$5,400
- - $2,179 578 - - - - - - -
-
kWh
$2,179
578
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,399
Cost:
$157
$1,196 15,240 $203 55 - - - - - - $1,196
15,240
kWh
$203
55
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,214
Cost:
$6,200
$4,514 57,151 $700 189 - - - - - - $4,514
57,151
kWh
$700
189
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,010
Cost:
-
$884 11,137 $126 34 - - - - - - $884
11,137
kWh
$126
34
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,390
Cost:
$279
$1,168 14,654 $222 60 - - - - - - $1,168
14,654
kWh
$222
60
kW-months/year
-
-
gal
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$14,497
Cost:
$6,000
- - - - - - $14,497 360,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$14,497
360,000
lb
-
-
$
09: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$1,720
Cost:
$6,000
- - - - $1,720 578 - - - - -
-
kWh
-
-
kW-months/year
$1,720
578
gal
-
-
lb
-
-
$
10: 4.446 AUTOMATE FINISHING PROCESS Savings:
$60,000
Cost:
$15,000
- - - - - - - - $60,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$60,000
-
$
TOTAL RECOMMENDED Savings:
$98,433
Cost:
$39,656
$17,817 224,501 $4,399 1,177 $1,720 578 $14,497 360,000 $60,000 - $17,817
224,501
kWh
$4,399
1,177
kW-months/year
$1,720
578
gal
$14,497
360,000
lb
$60,000
-
$
TOTAL IMPLEMENTED Savings:
$19,807
Cost:
$12,499
$15,737 198,124 $4,070 1,088 - - - - - - $15,737
198,124
kWh
$4,070
1,088
kW-months/year
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product