Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Corrugated Shipping Containers |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 162 |
Plant Area (Sq.Ft.) | 205,000 |
Annual Production | 47,000 Tons |
Production Hrs. Annual | 6,882 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $204,969 | 6,473,623 | kWh | $0.03 |
Electricity Demand | $221,056 | 15,650 | kW-months/year | $14.12 |
Natural Gas | $195,329 | 64,870 | MMBtu | $3.01 |
TOTAL ENERGY COSTS | $663,661 | |||
RECOMMENDED SAVINGS* | $160,448 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $110,902 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $13,260 Cost: $2,130 |
$7,258 | 226,846 | $6,002 | 425 | - | - | - | - | - | - |
$7,258 226,846 kWh |
$6,002 425 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,221 Cost: $2,950 |
$1,804 | 56,272 | $1,417 | 100 | - | - | - | - | - | - |
$1,804 56,272 kWh |
$1,417 100 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $226 Cost: - |
$124 | 3,810 | $102 | 7 | - | - | - | - | - | - |
$124 3,810 kWh |
$102 7 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,191 Cost: $290 |
$3,499 | 109,027 | $2,692 | 191 | - | - | - | - | - | - |
$3,499 109,027 kWh |
$2,692 191 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,809 Cost: $450 |
$953 | 29,894 | $856 | 61 | - | - | - | - | - | - |
$953 29,894 kWh |
$856 61 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $885 Cost: $180 |
- | - | - | - | $885 | 294 | - | - | - | - |
- - kWh |
- - kW-months/year |
$885 294 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $21,464 Cost: $15,300 |
$21,464 | 449,004 | - | - | - | - | - | - | - | - |
$21,464 449,004 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS |
Savings: $286 Cost: - |
$286 | 8,499 | - | - | - | - | - | - | - | - |
$286 8,499 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $4,429 Cost: - |
- | - | - | - | - | - | $4,429 | 84,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,429 84,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $677 Cost: - |
- | - | - | - | - | - | $677 | 16,800 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$677 16,800 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $36,000 Cost: $60,000 |
- | - | - | - | - | - | - | - | $36,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$36,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $72,000 Cost: $67,500 |
- | - | - | - | - | - | - | - | $72,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$72,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $160,448 Cost: $148,800 |
$35,388 | 883,352 | $11,069 | 784 | $885 | 294 | $5,106 | 100,800 | $108,000 | - | $35,388 883,352 kWh |
$11,069 784 kW-months/year |
$885 294 MMBtu |
$5,106 100,800 lb |
$108,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $110,902 Cost: $86,670 |
$27,844 | 648,007 | $5,067 | 359 | $885 | 294 | $5,106 | 100,800 | $72,000 | - | $27,844 648,007 kWh |
$5,067 359 kW-months/year |
$885 294 MMBtu |
$5,106 100,800 lb |
$72,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Product |