Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Continuous Snap Forms |
NAICS | n/a |
SIC | 2761 - Manifold Business Forms |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 80,139 |
Annual Production | 3,780,249 Pounds |
Production Hrs. Annual | 4,588 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,440 | 3,077,081 | kWh | $0.03 |
Electricity Demand | $123,711 | 7,278 | kW-months/year | $17.00 |
Natural Gas | $23,073 | 4,466 | MMBtu | $5.17 |
TOTAL ENERGY COSTS | $2,196,721 | |||
RECOMMENDED SAVINGS* | $227,294 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $145,574 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,924 Cost: $1,110 |
$1,451 | 52,755 | $2,473 | 145 | - | - | - | - |
$1,451 52,755 kWh |
$2,473 145 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $593 Cost: $593 |
$252 | 9,086 | $341 | 20 | - | - | - | - |
$252 9,086 kWh |
$341 20 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,749 Cost: $210 |
$791 | 28,722 | $958 | 56 | - | - | - | - |
$791 28,722 kWh |
$958 56 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $735 Cost: $15 |
$379 | 13,775 | $356 | 25 | - | - | - | - |
$379 13,775 kWh |
$356 25 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $591 Cost: $500 |
$69 | 2,638 | $522 | 31 | - | - | - | - |
$69 2,638 kWh |
$522 31 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS |
Savings: $129 Cost: $100 |
$129 | 4,689 | - | - | - | - | - | - |
$129 4,689 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $81,000 Cost: $51,950 |
- | - | - | - | $81,000 | 90,000 | - | - |
- - kWh |
- - kW-months/year |
$81,000 90,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $116,819 Cost: $18,225 |
- | - | - | - | $116,819 | 90,000 | - | - |
- - kWh |
- - kW-months/year |
$116,819 90,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $21,754 Cost: - |
- | - | - | - | - | - | $21,754 | - |
- - kWh |
- - kW-months/year |
- - lb |
$21,754 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $227,294 Cost: $72,703 |
$3,071 | 111,665 | $4,650 | 277 | $197,819 | 180,000 | $21,754 | - | $3,071 111,665 kWh |
$4,650 277 kW-months/year |
$197,819 180,000 lb |
$21,754 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $145,574 Cost: $20,153 |
$2,873 | 104,338 | $4,128 | 246 | $116,819 | 90,000 | $21,754 | - | $2,873 104,338 kWh |
$4,128 246 kW-months/year |
$116,819 90,000 lb |
$21,754 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product |