IAC logo
IAC Assessment: AR0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Peanut Butter
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 110
Plant Area (Sq.Ft.) 143,000
Annual Production 127,000,000 Pounds
Production Hrs. Annual 6,497
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $354,995 16,415,006 kWh $0.02
Electricity Demand $592,302 33,750 kW-months/year $17.55
Natural Gas $114,906 32,612 MMBtu $3.52
TOTAL ENERGY COSTS $1,001,375
RECOMMENDED SAVINGS* $101,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,438
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes
$ kWh $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$20,039
Cost:
$1,110
$20,039 360,492 - - - - $20,039
360,492
kWh
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,439
Cost:
$3,524
$2,439 7,913 - - - - $2,439
7,913
kWh
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,961
Cost:
-
$2,961 59,789 - - - - $2,961
59,789
kWh
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,406
Cost:
$500
$1,406 36,635 - - - - $1,406
36,635
kWh
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$907
Cost:
$90
$907 23,740 - - - - $907
23,740
kWh
-
-
lb
-
-
$
06: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS Savings:
$498
Cost:
-
$498 22,567 - - - - $498
22,567
kWh
-
-
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$48,811
Cost:
$10,230
- - $48,811 84,448 - - -
-
kWh
$48,811
84,448
lb
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$20,099
Cost:
$16,000
- - $20,099 29,268 - - -
-
kWh
$20,099
29,268
lb
-
-
$
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$4,032
Cost:
$21,600
- - - - $4,032 - -
-
kWh
-
-
lb
$4,032
-
$
TOTAL RECOMMENDED Savings:
$101,192
Cost:
$53,054
$28,250 511,136 $68,910 113,716 $4,032 - $28,250
511,136
kWh
$68,910
113,716
lb
$4,032
-
$
TOTAL IMPLEMENTED Savings:
$30,438
Cost:
$41,214
$6,307 91,442 $20,099 29,268 $4,032 - $6,307
91,442
kWh
$20,099
29,268
lb
$4,032
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes