Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Shoes and Boots |
NAICS | n/a |
SIC | 3143 - Men's Footwear, Except Athletic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 103,000 |
Annual Production | 725,000 Pieces |
Production Hrs. Annual | 2,040 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $73,543 | 2,122,509 | kWh | $0.03 |
Electricity Demand | $95,263 | 6,776 | kW-months/year | $14.06 |
Natural Gas | $5,972 | 1,118 | MMBtu | $5.34 |
TOTAL ENERGY COSTS | $234,450 | |||
RECOMMENDED SAVINGS* | $41,446 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,173 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,218 Cost: $202 |
$3,345 | 95,545 | $7,873 | 560 | - | - | - | - | - | - |
$3,345 95,545 kWh |
$7,873 560 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $65 Cost: $900 |
$19 | 586 | $46 | 3 | - | - | - | - | - | - |
$19 586 kWh |
$46 3 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $133 Cost: - |
$39 | 1,172 | $94 | 7 | - | - | - | - | - | - |
$39 1,172 kWh |
$94 7 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $604 Cost: $160 |
$177 | 4,982 | $427 | 30 | - | - | - | - | - | - |
$177 4,982 kWh |
$427 30 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7314 REDUCE VENTILATION AIR |
Savings: $4,426 Cost: $600 |
$4,426 | 228,898 | - | - | - | - | - | - | - | - |
$4,426 228,898 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,530 Cost: $200 |
$1,347 | 38,687 | $3,183 | 226 | - | - | - | - | - | - |
$1,347 38,687 kWh |
$3,183 226 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $7,019 Cost: - |
$(-223) | (-586) | - | - | - | - | $7,585 | 140,000 | $(-343) | - |
$(-223) (-586) kWh |
- - kW-months/year |
- - Tgal |
$7,585 140,000 lb |
$(-343) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $2,296 Cost: $4,200 |
- | - | - | - | $2,296 | 918,400 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,296 918,400 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $11,155 Cost: $4,500 |
- | - | - | - | - | - | $2,155 | 19,000 | $9,000 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$2,155 19,000 lb |
$9,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,446 Cost: $10,762 |
$9,130 | 369,284 | $11,623 | 826 | $2,296 | 918,400 | $9,740 | 159,000 | $8,657 | - | $9,130 369,284 kWh |
$11,623 826 kW-months/year |
$2,296 918,400 Tgal |
$9,740 159,000 lb |
$8,657 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,173 Cost: $1,700 |
$5,608 | 268,757 | $3,323 | 236 | - | - | $7,585 | 140,000 | $(-343) | - | $5,608 268,757 kWh |
$3,323 236 kW-months/year |
- - Tgal |
$7,585 140,000 lb |
$(-343) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes |