IAC logo
IAC Assessment: AR0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Milled Rice
NAICS n/a
SIC 2044 - Rice Milling
Sales $5,000,000-$10,000,000
# of Employees 53
Plant Area (Sq.Ft.) 43,300
Annual Production 440,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $332,219 9,228,898 kWh $0.04
Electricity Demand $131,037 18,643 kW-months/year $7.03
TOTAL ENERGY COSTS $465,157
RECOMMENDED SAVINGS* $155,216 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,915
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$352
Cost:
$228
$229 6,448 $123 17 - - - - $229
6,448
kWh
$123
17
kW-months/year
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,071
Cost:
$180
$651 18,171 $420 60 - - - - $651
18,171
kWh
$420
60
kW-months/year
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,183
Cost:
-
$7,252 201,348 $1,931 275 - - - - $7,252
201,348
kWh
$1,931
275
kW-months/year
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,301
Cost:
$23,460
$2,614 72,685 $687 98 - - - - $2,614
72,685
kWh
$687
98
kW-months/year
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,050
Cost:
$360
$846 23,447 $204 29 - - - - $846
23,447
kWh
$204
29
kW-months/year
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$119
Cost:
-
- - - - $119 11,900 - - -
-
kWh
-
-
kW-months/year
$119
11,900
lb
-
-
$
07: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$88,000
Cost:
$75,000
- - - - - - $88,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$88,000
-
$
08: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$52,140
Cost:
$3,000
- - - - - - $52,140 - -
-
kWh
-
-
kW-months/year
-
-
lb
$52,140
-
$
TOTAL RECOMMENDED Savings:
$155,216
Cost:
$102,228
$11,592 322,099 $3,365 479 $119 11,900 $140,140 - $11,592
322,099
kWh
$3,365
479
kW-months/year
$119
11,900
lb
$140,140
-
$
TOTAL IMPLEMENTED Savings:
$63,915
Cost:
$3,768
$8,978 249,414 $2,678 381 $119 11,900 $52,140 - $8,978
249,414
kWh
$2,678
381
kW-months/year
$119
11,900
lb
$52,140
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes