IAC logo
IAC Assessment: AR0135
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0135
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Aluminum Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 248,000
Annual Production 14,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $345,030 10,209,262 kWh $0.03
Electricity Demand $287,654 20,773 kW-months/year $13.85
Natural Gas $408,459 143,060 MMBtu $2.86
TOTAL ENERGY COSTS $1,054,245
RECOMMENDED SAVINGS* $56,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,891
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$30,801
Cost:
$21,375
- - $30,801 - - - - - - - -
-
kWh
$30,801
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,312
Cost:
$1,312
$723 21,395 $589 42 - - - - - - $723
21,395
kWh
$589
42
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,070
Cost:
$160
$4,230 124,267 $3,840 277 - - - - - - $4,230
124,267
kWh
$3,840
277
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$232
Cost:
-
$140 4,103 $92 7 - - - - - - $140
4,103
kWh
$92
7
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,294
Cost:
$28,500
$1,872 54,807 $1,422 103 - - - - - - $1,872
54,807
kWh
$1,422
103
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,028
Cost:
$117
- - - - $2,028 250 - - - - -
-
kWh
-
-
kW-months/year
$2,028
250
gal
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,448
Cost:
-
$(-111) (-293) - - - - $1,979 80,000 $(-420) - $(-111)
(-293)
kWh
-
-
kW-months/year
-
-
gal
$1,979
80,000
lb
$(-420)
-
$
08: 4.442 INSTALL MAGAZINES FOR TEMPORARY STORAGE Savings:
$9,000
Cost:
$34,345
- - - - - - - - $9,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$9,000
-
$
TOTAL RECOMMENDED Savings:
$56,185
Cost:
$85,809
$6,854 204,279 $36,744 429 $2,028 250 $1,979 80,000 $8,580 - $6,854
204,279
kWh
$36,744
429
kW-months/year
$2,028
250
gal
$1,979
80,000
lb
$8,580
-
$
TOTAL IMPLEMENTED Savings:
$43,891
Cost:
$22,964
$4,982 149,472 $35,322 326 $2,028 250 $1,979 80,000 $(-420) - $4,982
149,472
kWh
$35,322
326
kW-months/year
$2,028
250
gal
$1,979
80,000
lb
$(-420)
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes