IAC Assessment: AR0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Auto Lifts, Pipe Benders, Oil Filter Crushers
NAICS n/a
SIC 3549 - Metalworking Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 71
Plant Area (Sq.Ft.) 119,825
Annual Production 2,440 Pieces
Production Hrs. Annual 2,190
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,621 813,013 kWh $0.08
Electricity Demand $13,902 3,950 kW-months/year $3.52
Natural Gas $26,758 4,975 MMBtu $5.38
TOTAL ENERGY COSTS $110,699
RECOMMENDED SAVINGS* $47,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,013
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,674
Cost:
$300
$2,789 34,584 $885 251 - - - - - - - - $2,789
34,584
kWh
$885
251
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$269
Cost:
$460
$218 2,638 $51 15 - - - - - - - - $218
2,638
kWh
$51
15
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$619
Cost:
-
$504 6,155 $115 7 - - - - - - - - $504
6,155
kWh
$115
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,859
Cost:
$2,080
- - - - $1,859 346 - - - - - - -
-
kWh
-
-
kW-months/year
$1,859
346
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,363
Cost:
$150
$1,101 13,482 $262 75 - - - - - - - - $1,101
13,482
kWh
$262
75
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$383
Cost:
$120
$309 3,810 $74 21 - - - - - - - - $309
3,810
kWh
$74
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$6,960
Cost:
$10,000
- - - - - - $3,600 - - - $3,360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,600
-
$
-
-
$
$3,360
-
$
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$12,233
Cost:
$2,000
- - - - - - $324 - $10,685 - $1,224 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$324
-
$
$10,685
-
$
$1,224
-
$
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$19,710
Cost:
$2,250
- - - - - - $19,710 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,710
-
$
-
-
$
-
-
$
10: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$584
Cost:
$337
- - - - - - $584 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$584
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,654
Cost:
$17,697
$4,921 60,669 $1,387 369 $1,859 346 $24,218 - $10,685 - $4,584 - $4,921
60,669
kWh
$1,387
369
kW-months/year
$1,859
346
MMBtu
$24,218
-
$
$10,685
-
$
$4,584
-
$
TOTAL IMPLEMENTED Savings:
$43,013
Cost:
$16,940
$1,823 22,275 $428 97 $1,859 346 $23,634 - $10,685 - $4,584 - $1,823
22,275
kWh
$428
97
kW-months/year
$1,859
346
MMBtu
$23,634
-
$
$10,685
-
$
$4,584
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Primary Product