Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1998 |
Principal Product | Industrial Valves |
NAICS | n/a |
SIC | 3491 - Industrial Valves |
Sales | $10,000,000-$50,000,000 |
# of Employees | 86 |
Plant Area (Sq.Ft.) | 146,350 |
Annual Production | 28,800 Pieces |
Production Hrs. Annual | 4,171 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $120,768 | 3,780,774 | kWh | $0.03 |
Electricity Demand | $46,063 | 8,858 | kW-months/year | $5.20 |
Natural Gas | $52,964 | 9,799 | MMBtu | $5.41 |
TOTAL ENERGY COSTS | $225,286 | |||
RECOMMENDED SAVINGS* | $25,136 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,881 Cost: $200 |
$1,324 | 41,325 | $557 | 107 | - | - | - | - |
$1,324 41,325 kWh |
$557 107 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $602 Cost: $400 |
$429 | 13,482 | $173 | 33 | - | - | - | - |
$429 13,482 kWh |
$173 33 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,208 Cost: $17,401 |
$4,912 | 153,576 | $2,296 | 442 | - | - | - | - |
$4,912 153,576 kWh |
$2,296 442 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $413 Cost: $1,107 |
$256 | 7,913 | $157 | 30 | - | - | - | - |
$256 7,913 kWh |
$157 30 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $716 Cost: - |
$438 | 13,775 | $278 | 54 | - | - | - | - |
$438 13,775 kWh |
$278 54 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $2,894 Cost: $6,000 |
$(-55) | (-1,758) | $(-51) | (-10) | $3,000 | 4,000 | - | - |
$(-55) (-1,758) kWh |
$(-51) (-10) kW-months/year |
$3,000 4,000 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $11,422 Cost: $2,500 |
- | - | - | - | - | - | $11,422 | - |
- - kWh |
- - kW-months/year |
- - gal |
$11,422 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,136 Cost: $27,608 |
$7,304 | 228,313 | $3,410 | 656 | $3,000 | 4,000 | $11,422 | - | $7,304 228,313 kWh |
$3,410 656 kW-months/year |
$3,000 4,000 gal |
$11,422 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes |