IAC logo
IAC Assessment: AR0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Industrial Valves
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 86
Plant Area (Sq.Ft.) 146,350
Annual Production 28,800 Pieces
Production Hrs. Annual 4,171
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,768 3,780,774 kWh $0.03
Electricity Demand $46,063 8,858 kW-months/year $5.20
Natural Gas $52,964 9,799 MMBtu $5.41
TOTAL ENERGY COSTS $225,286
RECOMMENDED SAVINGS* $25,136 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,881
Cost:
$200
$1,324 41,325 $557 107 - - - - $1,324
41,325
kWh
$557
107
kW-months/year
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$602
Cost:
$400
$429 13,482 $173 33 - - - - $429
13,482
kWh
$173
33
kW-months/year
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,208
Cost:
$17,401
$4,912 153,576 $2,296 442 - - - - $4,912
153,576
kWh
$2,296
442
kW-months/year
-
-
gal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$413
Cost:
$1,107
$256 7,913 $157 30 - - - - $256
7,913
kWh
$157
30
kW-months/year
-
-
gal
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$716
Cost:
-
$438 13,775 $278 54 - - - - $438
13,775
kWh
$278
54
kW-months/year
-
-
gal
-
-
$
06: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$2,894
Cost:
$6,000
$(-55) (-1,758) $(-51) (-10) $3,000 4,000 - - $(-55)
(-1,758)
kWh
$(-51)
(-10)
kW-months/year
$3,000
4,000
gal
-
-
$
07: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$11,422
Cost:
$2,500
- - - - - - $11,422 - -
-
kWh
-
-
kW-months/year
-
-
gal
$11,422
-
$
TOTAL RECOMMENDED Savings:
$25,136
Cost:
$27,608
$7,304 228,313 $3,410 656 $3,000 4,000 $11,422 - $7,304
228,313
kWh
$3,410
656
kW-months/year
$3,000
4,000
gal
$11,422
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes