IAC logo
IAC Assessment: AR0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product Steel Tubing
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $50,000,000-$100,000,000
# of Employees 223
Plant Area (Sq.Ft.) 339,978
Annual Production 95,000 Tons
Production Hrs. Annual 6,880
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $560,727 13,894,490 kWh $0.04
Electricity Demand $207,752 30,462 kW-months/year $6.82
Natural Gas $59,814 13,857 MMBtu $4.32
TOTAL ENERGY COSTS $828,293
RECOMMENDED SAVINGS* $280,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,841
Cost:
$1,621
$1,418 34,584 $423 62 - - - - - - $1,418
34,584
kWh
$423
62
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,383
Cost:
$120
$10,138 247,362 $2,245 329 - - - - - - $10,138
247,362
kWh
$2,245
329
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$226
Cost:
$2,400
$174 4,396 $52 8 - - - - - - $174
4,396
kWh
$52
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$11,267
Cost:
$1,408
- - - - $11,267 2,608 - - - - -
-
kWh
-
-
kW-months/year
$11,267
2,608
MMBtu
-
-
$
-
-
$
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$251,669
Cost:
$66,400
$7,253 131,008 $2,166 318 - - $69,825 - $172,425 - $7,253
131,008
kWh
$2,166
318
kW-months/year
-
-
MMBtu
$69,825
-
$
$172,425
-
$
06: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$3,065
Cost:
$225
- - - - - - $3,065 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,065
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$280,451
Cost:
$72,174
$18,983 417,350 $4,886 717 $11,267 2,608 $72,890 - $172,425 - $18,983
417,350
kWh
$4,886
717
kW-months/year
$11,267
2,608
MMBtu
$72,890
-
$
$172,425
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material