IAC logo
IAC Assessment: AR0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product Roll steel
NAICS n/a
SIC 3316 - Cold Finishing Of Steel Shapes
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 140,000
Annual Production 62,400 Tons
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,697 1,031,946 kWh $0.04
Electricity Demand $25,174 3,039 kW-months/year $8.28
Natural Gas $10,825 2,110 MMBtu $5.13
TOTAL ENERGY COSTS $76,861
RECOMMENDED SAVINGS* $200,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,704
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,789
Cost:
$2,617
$1,193 29,308 $596 72 - - - - $1,193
29,308
kWh
$596
72
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,915
Cost:
$1,521
$1,223 29,894 $692 83 - - - - $1,223
29,894
kWh
$692
83
kW-months/year
-
-
lb
-
-
$
03: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$21,233
Cost:
$25,000
- - - - $21,233 141,553 - - -
-
kWh
-
-
kW-months/year
$21,233
141,553
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$176,000
Cost:
$24,000
- - - - - - $176,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$176,000
-
$
TOTAL RECOMMENDED Savings:
$200,937
Cost:
$53,138
$2,416 59,202 $1,288 155 $21,233 141,553 $176,000 - $2,416
59,202
kWh
$1,288
155
kW-months/year
$21,233
141,553
lb
$176,000
-
$
TOTAL IMPLEMENTED Savings:
$3,704
Cost:
$4,138
$2,416 59,202 $1,288 155 - - - - $2,416
59,202
kWh
$1,288
155
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes