IAC Assessment: AR0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product Unsupported plastics film and sheets
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 30,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 2,912
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $335,868 10,322,978 kWh $0.03
Electricity Demand $192,151 18,844 kW-months/year $10.20
Natural Gas $107,919 32,582 MMBtu $3.31
TOTAL ENERGY COSTS $641,903
RECOMMENDED SAVINGS* $47,615 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,698
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,698
Cost:
$6,378
$1,601 48,652 $1,097 108 - - - - $1,601
48,652
kWh
$1,097
108
kW-months/year
-
-
Tgal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,846
Cost:
$2,882
$1,223 37,222 $623 61 - - - - $1,223
37,222
kWh
$623
61
kW-months/year
-
-
Tgal
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$672
Cost:
$500
- - - - $672 120,000 - - -
-
kWh
-
-
kW-months/year
$672
120,000
Tgal
-
-
$
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$42,399
Cost:
$1,284
- - - - - - $42,399 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$42,399
-
$
TOTAL RECOMMENDED Savings:
$47,615
Cost:
$11,044
$2,824 85,874 $1,720 169 $672 120,000 $42,399 - $2,824
85,874
kWh
$1,720
169
kW-months/year
$672
120,000
Tgal
$42,399
-
$
TOTAL IMPLEMENTED Savings:
$2,698
Cost:
$6,378
$1,601 48,652 $1,097 108 - - - - $1,601
48,652
kWh
$1,097
108
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes