IAC logo
IAC Assessment: AR0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product
NAICS n/a
SIC 2026 - Fluid Milk
Sales n/a
# of Employees 65
Plant Area (Sq.Ft.) 114,000
Annual Production 138,000,000 Units
Production Hrs. Annual 2,496
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,012 7,418,816 kWh $0.03
Electricity Demand $188,814 1,792 kW-months/year $105.36
Natural Gas $98,215 22,839 MMBtu $4.30
TOTAL ENERGY COSTS $632,018
RECOMMENDED SAVINGS* $445,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,480
Cost:
$1,214
$1,137 24,912 $343 32 - - - - - - $1,137
24,912
kWh
$343
32
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,452
Cost:
$6,656
- - - - $5,452 1,268 - - - - -
-
kWh
-
-
kW-months/year
$5,452
1,268
MMBtu
-
-
lb
-
-
$
03: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$48,768
Cost:
$92,500
- - $48,768 4,596 - - - - - - -
-
kWh
$48,768
4,596
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,480
Cost:
$8,000
- - - - - - $5,480 (-3) - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,480
(-3)
lb
-
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$384,000
Cost:
$400,000
- - - - - - - - $384,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$384,000
-
$
TOTAL RECOMMENDED Savings:
$445,180
Cost:
$508,370
$1,137 24,912 $49,111 4,628 $5,452 1,268 $5,480 (-3) $384,000 - $1,137
24,912
kWh
$49,111
4,628
kW-months/year
$5,452
1,268
MMBtu
$5,480
(-3)
lb
$384,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product