IAC logo
IAC Assessment: AR0179
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0179
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product Fabricated Metal Products
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 175,000
Annual Production 9,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,720 3,782,532 kWh $0.03
Electricity Demand $86,327 12,911 kW-months/year $6.69
Natural Gas $72,572 15,433 MMBtu $4.70
TOTAL ENERGY COSTS $286,885
RECOMMENDED SAVINGS* $22,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$324
Cost:
$880
$249 5,569 $75 11 - - - - - - $249
5,569
kWh
$75
11
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$249
Cost:
-
$192 4,396 $57 9 - - - - - - $192
4,396
kWh
$57
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,887
Cost:
$7,458
$3,690 80,305 $1,197 179 - - - - - - $3,690
80,305
kWh
$1,197
179
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$659
Cost:
$316
- - $12 2 $349 4 - - $298 - -
-
kWh
$12
2
kW-months/year
$349
4
MMBtu
-
-
lb
$298
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,467
Cost:
$50
$1,130 25,498 $337 50 - - - - - - $1,130
25,498
kWh
$337
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,369
Cost:
$60
$2,591 58,617 $778 116 - - - - - - $2,591
58,617
kWh
$778
116
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$11,643
Cost:
$8,000
$(-232) (-1,172) - - - - $11,875 - - - $(-232)
(-1,172)
kWh
-
-
kW-months/year
-
-
MMBtu
$11,875
-
lb
-
-
$
08: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
-
Cost:
$6,000
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$22,598
Cost:
$22,764
$7,620 173,213 $2,456 367 $349 4 $11,875 - $298 - $7,620
173,213
kWh
$2,456
367
kW-months/year
$349
4
MMBtu
$11,875
-
lb
$298
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes