IAC Assessment: AR0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 2000
Principal Product Steel Forgings
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 186,000
Annual Production 600,000 Pieces
Production Hrs. Annual 5,787
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,941 6,220,985 kWh $0.04
Electricity Demand $208,476 23,678 kW-months/year $8.80
Natural Gas $404,499 143,645 MMBtu $2.82
TOTAL ENERGY COSTS $847,387
RECOMMENDED SAVINGS* $301,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,452
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$916
Cost:
$1,360
$586 15,826 $330 38 - - - - - - - - $586
15,826
kWh
$330
38
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$351
Cost:
-
$225 6,155 $126 14 - - - - - - - - $225
6,155
kWh
$126
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$496
Cost:
$180
$252 6,741 $244 28 - - - - - - - - $252
6,741
kWh
$244
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,868
Cost:
$130
$8,095 218,933 $3,773 429 - - - - - - - - $8,095
218,933
kWh
$3,773
429
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$60,765
Cost:
$150,000
- - - - $60,765 24,509 - - - - - - -
-
kWh
-
-
kW-months/year
$60,765
24,509
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$4,468
Cost:
$175
- - - - - - $4,468 2,628,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,468
2,628,000
Tgal
-
-
lb
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$222,939
Cost:
$244,000
- - - - $64,818 46,027 - - $89,910 408,682 $68,211 - -
-
kWh
-
-
kW-months/year
$64,818
46,027
MMBtu
-
-
Tgal
$89,910
408,682
lb
$68,211
-
$
TOTAL RECOMMENDED Savings:
$301,803
Cost:
$395,845
$9,158 247,655 $4,473 509 $125,583 70,536 $4,468 2,628,000 $89,910 408,682 $68,211 - $9,158
247,655
kWh
$4,473
509
kW-months/year
$125,583
70,536
MMBtu
$4,468
2,628,000
Tgal
$89,910
408,682
lb
$68,211
-
$
TOTAL IMPLEMENTED Savings:
$77,452
Cost:
$150,305
$8,320 225,088 $3,899 443 $60,765 24,509 $4,468 2,628,000 - - - - $8,320
225,088
kWh
$3,899
443
kW-months/year
$60,765
24,509
MMBtu
$4,468
2,628,000
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product