Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 2000 |
Principal Product | Industrial Machinery |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 16,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $43,427 | 1,361,079 | kWh | $0.03 |
Electricity Demand | $50,113 | 4,332 | kW-months/year | $11.57 |
Natural Gas | $17,633 | 3,237 | MMBtu | $5.45 |
TOTAL ENERGY COSTS | $111,173 | |||
RECOMMENDED SAVINGS* | $76,159 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $217 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,606 Cost: $4,020 |
$7,188 | 117,819 | $3,418 | 295 | - | - | - | - | - | - |
$7,188 117,819 kWh |
$3,418 295 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $672 Cost: $828 |
$448 | 586 | $224 | 19 | - | - | - | - | - | - |
$448 586 kWh |
$224 19 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $217 Cost: - |
$144 | 2,345 | $73 | 6 | - | - | - | - | - | - |
$144 2,345 kWh |
$73 6 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,146 Cost: $4,224 |
$2,049 | 29,894 | $1,097 | 95 | - | - | - | - | - | - |
$2,049 29,894 kWh |
$1,097 95 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $20,376 Cost: $1,300 |
- | - | - | - | $15,647 | - | $4,729 | - | - | - |
- - kWh |
- - kW-months/year |
$15,647 - Tgal |
$4,729 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.452 ELIMINATE SHIFT |
Savings: $41,142 Cost: - |
- | - | - | - | - | - | - | - | $41,142 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - $ |
$41,142 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $76,159 Cost: $10,372 |
$9,829 | 150,644 | $4,812 | 415 | $15,647 | - | $4,729 | - | $41,142 | - | $9,829 150,644 kWh |
$4,812 415 kW-months/year |
$15,647 - Tgal |
$4,729 - $ |
$41,142 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $217 Cost: - |
$144 | 2,345 | $73 | 6 | - | - | - | - | - | - | $144 2,345 kWh |
$73 6 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | Primary Product |