IAC Assessment: AR0187
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 2000
Principal Product Plastic Injection Molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 28,500
Annual Production 250,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,670 893,025 kWh $0.04
Electricity Demand $29,896 2,901 kW-months/year $10.31
Natural Gas $1,611 213 MMBtu $7.56
TOTAL ENERGY COSTS $64,177
RECOMMENDED SAVINGS* $479,037 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $558
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$608
Cost:
$720
$358 9,672 $250 24 - - - - - - $358
9,672
kWh
$250
24
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$310
Cost:
$130
$150 4,103 $160 16 - - - - - - $150
4,103
kWh
$160
16
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,257
Cost:
$2,916
$728 19,637 $529 51 - - - - - - $728
19,637
kWh
$529
51
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$526
Cost:
$783
$350 9,379 $176 17 - - - - - - $350
9,379
kWh
$176
17
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$32
Cost:
-
$21 586 $11 1 - - - - - - $21
586
kWh
$11
1
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,789
Cost:
$3,600
$1,789 48,359 - - - - - - - - $1,789
48,359
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,157
Cost:
$5,000
- - - - $1,157 - - - - - -
-
kWh
-
-
kW-months/year
$1,157
-
lb
-
-
$
-
-
$
08: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$76,150
Cost:
$6,000
- - - - - - $76,150 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$76,150
-
$
-
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$397,208
Cost:
$44,000
- - - - - - - - $397,208 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$397,208
-
$
TOTAL RECOMMENDED Savings:
$479,037
Cost:
$63,149
$3,396 91,736 $1,126 109 $1,157 - $76,150 - $397,208 - $3,396
91,736
kWh
$1,126
109
kW-months/year
$1,157
-
lb
$76,150
-
$
$397,208
-
$
TOTAL IMPLEMENTED Savings:
$558
Cost:
$783
$371 9,965 $187 18 - - - - - - $371
9,965
kWh
$187
18
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product By-product Production