IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product LAMINATED GLASS
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $1,000,000-$5,000,000
# of Employees 24
Plant Area (Sq.Ft.) 0
Annual Production 1 Thousand Feet
Production Hrs. Annual 1,968
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,808 420,868 kWh $0.10
TOTAL ENERGY COSTS $42,808
RECOMMENDED SAVINGS* $10,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$60
Cost:
$159
$60 586 $60
586
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$92
Cost:
-
$92 879 $92
879
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,377
Cost:
$1,000
$8,377 82,356 $8,377
82,356
kWh
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$392
Cost:
$1,170
$392 3,810 $392
3,810
kWh
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$400
Cost:
$100
$400 3,810 $400
3,810
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$794
Cost:
$34
$794 7,913 $794
7,913
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$84
Cost:
$168
$84 879 $84
879
kWh
TOTAL RECOMMENDED Savings:
$10,199
Cost:
$2,631
$10,199 100,233 $10,199
100,233
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh