IAC logo
IAC Assessment: AS0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product PRINTED CIRCUITS
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 150,000 Pieces
Production Hrs. Annual 6,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $875,213 13,802,755 kWh $0.06
Natural Gas $96,713 21,554 MMBtu $4.49
TOTAL ENERGY COSTS $971,926
RECOMMENDED SAVINGS* $249,111 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$54,844
Cost:
$127,000
$54,844 865,182 - - $54,844
865,182
kWh
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,865
Cost:
$50,000
$11,865 187,280 - - $11,865
187,280
kWh
-
-
MMBtu
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$7,962
Cost:
$20,000
$7,962 171,454 - - $7,962
171,454
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,253
Cost:
$4,496
$3,253 51,290 - - $3,253
51,290
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,847
Cost:
$40
$7,847 123,681 - - $7,847
123,681
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$653
Cost:
$933
$653 10,258 - - $653
10,258
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,863
Cost:
$3,333
$1,863 29,308 - - $1,863
29,308
kWh
-
-
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,751
Cost:
-
$5,751 90,856 - - $5,751
90,856
kWh
-
-
MMBtu
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$4,763
Cost:
$3,054
- - $4,763 1,061 -
-
kWh
$4,763
1,061
MMBtu
10: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$150,310
Cost:
-
$247,240 3,901,231 $(-96,930) (-21,468) $247,240
3,901,231
kWh
$(-96,930)
(-21,468)
MMBtu
TOTAL RECOMMENDED Savings:
$249,111
Cost:
$208,856
$341,278 5,430,540 $(-92,167) (-20,407) $341,278
5,430,540
kWh
$(-92,167)
(-20,407)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas