IAC Assessment: AS0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product INTEGRATED CIRCUIT CHIPS
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 390
Plant Area (Sq.Ft.) 0
Annual Production 260,000 Pieces
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $305,798 5,002,052 kWh $0.06
Natural Gas $5,556 939 MMBtu $5.92
TOTAL ENERGY COSTS $311,354
RECOMMENDED SAVINGS* $50,538 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,721
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$14,714
Cost:
$20,000
$14,714 326,788 - - - - $14,714
326,788
kWh
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,923
Cost:
$800
$4,923 80,598 - - - - $4,923
80,598
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$451
Cost:
$1,804
$451 7,327 - - - - $451
7,327
kWh
-
-
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$556
Cost:
$200
$556 9,086 - - - - $556
9,086
kWh
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,850
Cost:
$1,755
$8,469 138,628 $(-2,619) (-443) - - $8,469
138,628
kWh
$(-2,619)
(-443)
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,835
Cost:
$30,355
$5,670 92,614 - - $(-835) - $5,670
92,614
kWh
-
-
MMBtu
$(-835)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$369
Cost:
$380
$369 6,155 - - - - $369
6,155
kWh
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,840
Cost:
$50,250
$18,840 - - - - - $18,840
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,538
Cost:
$105,544
$53,992 661,196 $(-2,619) (-443) $(-835) - $53,992
661,196
kWh
$(-2,619)
(-443)
MMBtu
$(-835)
-
$
TOTAL IMPLEMENTED Savings:
$15,721
Cost:
$22,004
$15,721 343,201 - - - - $15,721
343,201
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes