Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1992 |
Principal Product | READY-MIX CEMENT |
NAICS | n/a |
SIC | 3272 - Concrete Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,200,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $558,238 | 6,121,337 | kWh | $0.09 |
Natural Gas | $7,114 | 1,008 | MMBtu | $7.06 |
Fuel Oil #6 | $100,393 | 32,545 | MMBtu | $3.08 |
TOTAL ENERGY COSTS | $665,745 | |||
RECOMMENDED SAVINGS* | $160,661 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,998 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,252 Cost: $38,963 |
$5,252 | 57,444 | - | - | - | - | - | - |
$5,252 57,444 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $12,356 Cost: - |
$12,356 | 135,404 | - | - | - | - | - | - |
$12,356 135,404 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,689 Cost: $13,875 |
$1,689 | 18,464 | - | - | - | - | - | - |
$1,689 18,464 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $7,142 Cost: - |
$7,142 | 78,253 | - | - | - | - | - | - |
$7,142 78,253 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,019 Cost: $1,000 |
$7,019 | 77,081 | - | - | - | - | - | - |
$7,019 77,081 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $3,077 Cost: - |
$3,077 | 33,705 | - | - | - | - | - | - |
$3,077 33,705 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,360 Cost: $200 |
$2,360 | 25,791 | - | - | - | - | - | - |
$2,360 25,791 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,929 Cost: $1,885 |
- | - | - | - | $2,929 | 948 | - | - |
- - kWh |
- - MMBtu |
$2,929 948 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT |
Savings: $263 Cost: $900 |
$263 | 2,931 | - | - | - | - | - | - |
$263 2,931 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $514 Cost: $5,315 |
$628 | 7,034 | - | - | - | - | $(-114) | - |
$628 7,034 kWh |
- - MMBtu |
- - MMBtu |
$(-114) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,018 Cost: $2,410 |
$2,160 | 23,740 | - | - | - | - | $(-142) | - |
$2,160 23,740 kWh |
- - MMBtu |
- - MMBtu |
$(-142) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,148 Cost: $5,040 |
$5,148 | 56,565 | - | - | - | - | - | - |
$5,148 56,565 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $460 Cost: $70 |
$460 | 4,982 | - | - | - | - | - | - |
$460 4,982 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $104,246 Cost: $350,000 |
$199,602 | 2,038,980 | $(-64,771) | (-20,178) | - | - | $(-30,585) | - |
$199,602 2,038,980 kWh |
$(-64,771) (-20,178) MMBtu |
- - MMBtu |
$(-30,585) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $6,188 Cost: $4,000 |
$1,516 | 16,706 | - | - | - | - | $4,672 | - |
$1,516 16,706 kWh |
- - MMBtu |
- - MMBtu |
$4,672 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $160,661 Cost: $423,658 |
$248,672 | 2,577,080 | $(-64,771) | (-20,178) | $2,929 | 948 | $(-26,169) | - | $248,672 2,577,080 kWh |
$(-64,771) (-20,178) MMBtu |
$2,929 948 MMBtu |
$(-26,169) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,998 Cost: $13,035 |
$30,254 | 331,769 | - | - | - | - | $(-256) | - | $30,254 331,769 kWh |
- - MMBtu |
- - MMBtu |
$(-256) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes |