IAC logo
IAC Assessment: AS0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product READY-MIX ASPHALT
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 802,000 Tons
Production Hrs. Annual 2,340
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,128 5,504,103 kWh $0.09
Natural Gas $177,202 38,905 MMBtu $4.55
Fuel Oil #2 $2,870 1,030 MMBtu $2.79
TOTAL ENERGY COSTS $670,200
RECOMMENDED SAVINGS* $97,874 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$50,496
Cost:
$337,500
$57,935 562,427 - - $2,875 1,030 $(-10,314) - $57,935
562,427
kWh
-
-
MMBtu
$2,875
1,030
MMBtu
$(-10,314)
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$23,380
Cost:
$240,000
$34,229 400,059 $(-4,848) (-2,255) - - $(-6,001) - $34,229
400,059
kWh
$(-4,848)
(-2,255)
MMBtu
-
-
MMBtu
$(-6,001)
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,081
Cost:
$43,663
$4,081 45,721 - - - - - - $4,081
45,721
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,817
Cost:
-
$8,817 99,062 - - - - - - $8,817
99,062
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$514
Cost:
$200
$514 5,862 - - - - - - $514
5,862
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$705
Cost:
$5,815
$783 8,792 - - - - $(-78) - $783
8,792
kWh
-
-
MMBtu
-
-
MMBtu
$(-78)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,887
Cost:
$4,292
$8,887 99,941 - - - - - - $8,887
99,941
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$994
Cost:
-
$994 9,965 - - - - - - $994
9,965
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$97,874
Cost:
$631,470
$116,240 1,231,829 $(-4,848) (-2,255) $2,875 1,030 $(-16,393) - $116,240
1,231,829
kWh
$(-4,848)
(-2,255)
MMBtu
$2,875
1,030
MMBtu
$(-16,393)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes