Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1992 |
Principal Product | FIBERGLASS ARCHERY BOWS |
NAICS | n/a |
SIC | 3949 - Sporting And Athletic Goods, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 335 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $345,000 | 4,067,409 | kWh | $0.08 |
TOTAL ENERGY COSTS | $345,000 | |||
RECOMMENDED SAVINGS* | $82,438 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $82,438 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $40,257 Cost: $64,053 |
$41,796 | 492,673 | - | - | $(-1,539) | - |
$41,796 492,673 kWh |
- - MMBtu |
$(-1,539) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING |
Savings: $33,994 Cost: $182,325 |
$33,994 | 400,645 | - | - | - | - |
$33,994 400,645 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT |
Savings: $2,531 Cost: $3,100 |
$2,531 | 29,894 | - | - | - | - |
$2,531 29,894 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $776 Cost: $1,400 |
- | - | $776 | 140 | - | - |
- - kWh |
$776 140 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,087 Cost: $200 |
$2,087 | 24,619 | - | - | - | - |
$2,087 24,619 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $470 Cost: $400 |
$470 | 5,569 | - | - | - | - |
$470 5,569 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS |
Savings: $539 Cost: $114 |
$539 | 6,448 | - | - | - | - |
$539 6,448 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $273 Cost: $100 |
$273 | 3,224 | - | - | - | - |
$273 3,224 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,036 Cost: $3,213 |
$1,036 | 12,309 | - | - | - | - |
$1,036 12,309 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $475 Cost: - |
$475 | 5,569 | - | - | - | - |
$475 5,569 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,438 Cost: $254,905 |
$83,201 | 980,950 | $776 | 140 | $(-1,539) | - | $83,201 980,950 kWh |
$776 140 MMBtu |
$(-1,539) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $82,438 Cost: $254,905 |
$83,201 | 980,950 | $776 | 140 | $(-1,539) | - | $83,201 980,950 kWh |
$776 140 MMBtu |
$(-1,539) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |