IAC logo
IAC Assessment: AS0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product FLOUR TORTILLAS
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 29,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,308 2,961,899 kWh $0.06
Natural Gas $140,953 31,998 MMBtu $4.41
TOTAL ENERGY COSTS $326,261
RECOMMENDED SAVINGS* $16,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$3,687
Cost:
$91,000
$23,428 374,267 $(-14,127) (-4,713) $(-5,614) - $23,428
374,267
kWh
$(-14,127)
(-4,713)
MMBtu
$(-5,614)
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,884
Cost:
$4,112
$3,884 62,134 - - - - $3,884
62,134
kWh
-
-
MMBtu
-
-
$
03: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT Savings:
$326
Cost:
$600
$326 5,275 - - - - $326
5,275
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,371
Cost:
$2,875
$1,371 21,981 - - - - $1,371
21,981
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$273
Cost:
$5,904
$325 5,275 - - $(-52) - $325
5,275
kWh
-
-
MMBtu
$(-52)
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$486
Cost:
$750
$486 7,913 - - - - $486
7,913
kWh
-
-
MMBtu
-
-
$
07: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$4,703
Cost:
$700
$4,703 75,029 - - - - $4,703
75,029
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$442
Cost:
$2,036
$442 7,034 - - - - $442
7,034
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$638
Cost:
$300
$638 10,258 - - - - $638
10,258
kWh
-
-
MMBtu
-
-
$
10: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$479
Cost:
$546
$479 7,620 - - - - $479
7,620
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$16,289
Cost:
$108,823
$36,082 576,786 $(-14,127) (-4,713) $(-5,666) - $36,082
576,786
kWh
$(-14,127)
(-4,713)
MMBtu
$(-5,666)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes