IAC Assessment: AS0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product HEAT TREATING
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 54
Plant Area (Sq.Ft.) 0
Annual Production 132,600 Pieces
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $375,222 4,701,934 kWh $0.08
Natural Gas $85,075 18,058 MMBtu $4.71
TOTAL ENERGY COSTS $460,297
RECOMMENDED SAVINGS* $222,682 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $222,682
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,219
Cost:
$4,230
$1,219 15,240 - - - - $1,219
15,240
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,749
Cost:
-
$1,749 21,981 - - - - $1,749
21,981
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,062
Cost:
$4,836
$1,062 13,189 - - - - $1,062
13,189
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,140
Cost:
$7,221
$3,259 40,739 - - $(-119) - $3,259
40,739
kWh
-
-
MMBtu
$(-119)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,921
Cost:
$7,200
$4,921 61,547 - - - - $4,921
61,547
kWh
-
-
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,845
Cost:
-
$1,845 23,154 - - - - $1,845
23,154
kWh
-
-
MMBtu
-
-
$
07: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT Savings:
$384
Cost:
$800
$384 4,689 - - - - $384
4,689
kWh
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$739
Cost:
$500
$739 9,379 - - - - $739
9,379
kWh
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,623
Cost:
$200
$1,623 20,223 - - - - $1,623
20,223
kWh
-
-
MMBtu
-
-
$
10: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$206,000
Cost:
$800,000
$375,222 4,701,934 $(-98,693) (-35,010) $(-70,529) - $375,222
4,701,934
kWh
$(-98,693)
(-35,010)
MMBtu
$(-70,529)
-
$
TOTAL RECOMMENDED Savings:
$222,682
Cost:
$824,987
$392,023 4,912,075 $(-98,693) (-35,010) $(-70,648) - $392,023
4,912,075
kWh
$(-98,693)
(-35,010)
MMBtu
$(-70,648)
-
$
TOTAL IMPLEMENTED Savings:
$222,682
Cost:
$824,987
$392,023 4,912,075 $(-98,693) (-35,010) $(-70,648) - $392,023
4,912,075
kWh
$(-98,693)
(-35,010)
MMBtu
$(-70,648)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes