IAC Assessment: AS0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product PHARMACEUTICAL DRUGS
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pieces
Production Hrs. Annual 5,304
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $822,354 13,906,800 kWh $0.06
TOTAL ENERGY COSTS $822,354
RECOMMENDED SAVINGS* $303,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $303,419
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$793
Cost:
$6,684
$793 13,482 - - - - $793
13,482
kWh
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,648
Cost:
$6,290
$2,648 44,842 - - - - $2,648
44,842
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,425
Cost:
$82,095
$22,425 379,250 - - - - $22,425
379,250
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$352
Cost:
$1,008
$352 5,862 - - - - $352
5,862
kWh
-
-
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$264,625
Cost:
$2,031,000
$624,765 10,772,568 $(-198,551) (-72,462) $(-161,589) - $624,765
10,772,568
kWh
$(-198,551)
(-72,462)
MMBtu
$(-161,589)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$264
Cost:
$280
- - $264 58 - - -
-
kWh
$264
58
MMBtu
-
-
$
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,838
Cost:
$7,000
- - $2,838 621 - - -
-
kWh
$2,838
621
MMBtu
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,956
Cost:
$19,000
- - $6,956 1,522 - - -
-
kWh
$6,956
1,522
MMBtu
-
-
$
09: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$2,518
Cost:
$5,000
- - $2,518 531 - - -
-
kWh
$2,518
531
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$303,419
Cost:
$2,158,357
$650,983 11,216,004 $(-185,975) (-69,730) $(-161,589) - $650,983
11,216,004
kWh
$(-185,975)
(-69,730)
MMBtu
$(-161,589)
-
$
TOTAL IMPLEMENTED Savings:
$303,419
Cost:
$2,158,357
$650,983 11,216,004 $(-185,975) (-69,730) $(-161,589) - $650,983
11,216,004
kWh
$(-185,975)
(-69,730)
MMBtu
$(-161,589)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes