IAC logo
IAC Assessment: AS0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product PLASTIC INJECTION MOLDS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 50,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,444,676 23,461,900 kWh $0.06
TOTAL ENERGY COSTS $1,444,676
RECOMMENDED SAVINGS* $53,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$9,429
Cost:
$20,000
$9,429 152,989 - - $9,429
152,989
kWh
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,357
Cost:
$6,496
$1,357 21,981 - - $1,357
21,981
kWh
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,399
Cost:
$42,903
$4,399 71,512 - - $4,399
71,512
kWh
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,586
Cost:
-
$5,586 90,856 - - $5,586
90,856
kWh
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,491
Cost:
$291
$9,491 154,162 - - $9,491
154,162
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,155
Cost:
$14,207
$3,155 51,290 - - $3,155
51,290
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,653
Cost:
$342
$2,903 47,186 $(-250) - $2,903
47,186
kWh
$(-250)
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,667
Cost:
$11,960
$12,667 205,744 - - $12,667
205,744
kWh
-
-
$
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,161
Cost:
$10,760
$4,161 67,702 - - $4,161
67,702
kWh
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$486
Cost:
$100
$486 7,913 - - $486
7,913
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$53,384
Cost:
$107,059
$53,634 871,335 $(-250) - $53,634
871,335
kWh
$(-250)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes