IAC logo
IAC Assessment: AS0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1992
Principal Product PLASTIC INJECTION MOLDS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 143,612 Pieces
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $453,088 7,586,460 kWh $0.06
TOTAL ENERGY COSTS $453,088
RECOMMENDED SAVINGS* $55,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,070
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,226
Cost:
$5,173
$1,226 20,516 - - $1,226
20,516
kWh
-
-
$
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$11,610
Cost:
$9,350
$11,610 194,607 - - $11,610
194,607
kWh
-
-
$
03: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT Savings:
$245
Cost:
$400
$245 4,103 - - $245
4,103
kWh
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,325
Cost:
-
$5,325 89,097 - - $5,325
89,097
kWh
-
-
$
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,124
Cost:
$6,200
$3,124 52,462 - - $3,124
52,462
kWh
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$354
Cost:
$1,072
$354 5,862 - - $354
5,862
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,554
Cost:
$18,562
$8,890 148,886 $(-336) - $8,890
148,886
kWh
$(-336)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,444
Cost:
$13,440
$11,025 184,642 $(-1,581) - $11,025
184,642
kWh
$(-1,581)
-
$
09: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$4,072
Cost:
$1,800
$4,072 68,288 - - $4,072
68,288
kWh
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,060
Cost:
$400
$8,060 135,111 - - $8,060
135,111
kWh
-
-
$
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,056
Cost:
$2,000
$3,056 51,290 - - $3,056
51,290
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$55,070
Cost:
$58,397
$56,987 954,864 $(-1,917) - $56,987
954,864
kWh
$(-1,917)
-
$
TOTAL IMPLEMENTED Savings:
$55,070
Cost:
$58,397
$56,987 954,864 $(-1,917) - $56,987
954,864
kWh
$(-1,917)
-
$