IAC logo
IAC Assessment: AS0081
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0081
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product EVAPORATIVE COOLERS
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 71,000 Pieces
Production Hrs. Annual 2,550
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,701 1,302,755 kWh $0.08
Natural Gas $72,692 15,813 MMBtu $4.60
TOTAL ENERGY COSTS $178,393
RECOMMENDED SAVINGS* $5,397 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,927
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$230
Cost:
$323
$259 3,224 $(-29) - $259
3,224
kWh
$(-29)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$249
Cost:
-
$294 3,517 $(-45) - $294
3,517
kWh
$(-45)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$126
Cost:
$612
$126 1,465 - - $126
1,465
kWh
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$479
Cost:
$1,179
$479 5,862 - - $479
5,862
kWh
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$991
Cost:
-
$991 12,309 - - $991
12,309
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,092
Cost:
$570
$1,092 13,482 - - $1,092
13,482
kWh
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,031
Cost:
-
$1,031 12,603 - - $1,031
12,603
kWh
-
-
$
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,199
Cost:
$4,250
$1,199 14,654 - - $1,199
14,654
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$5,397
Cost:
$6,934
$5,471 67,116 $(-74) - $5,471
67,116
kWh
$(-74)
-
$
TOTAL IMPLEMENTED Savings:
$3,927
Cost:
$5,755
$4,001 48,945 $(-74) - $4,001
48,945
kWh
$(-74)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes