IAC logo
IAC Assessment: AS0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product FLOUR/CORN TORTILLA,CHIP
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 6,000,000 Pounds
Production Hrs. Annual 5,200
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,620 1,977,726 kWh $0.08
Natural Gas $112,529 25,066 MMBtu $4.49
TOTAL ENERGY COSTS $273,149
RECOMMENDED SAVINGS* $104,951 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,040
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$100,911
Cost:
$482,500
$150,173 - $(-59,148) (-18,426) $9,886 - $150,173
-
kWh
$(-59,148)
(-18,426)
MMBtu
$9,886
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$270
Cost:
$400
- - $270 61 - - -
-
kWh
$270
61
MMBtu
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$186
Cost:
$240
- - $186 42 - - -
-
kWh
$186
42
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$213
Cost:
$300
- - $213 48 - - -
-
kWh
$213
48
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$469
Cost:
$703
$469 5,862 - - - - $469
5,862
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$267
Cost:
-
$267 3,224 - - - - $267
3,224
kWh
-
-
MMBtu
-
-
$
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,635
Cost:
$4,543
$1,635 20,223 - - - - $1,635
20,223
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$510
Cost:
-
$545 6,741 - - $(-35) - $545
6,741
kWh
-
-
MMBtu
$(-35)
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$490
Cost:
$500
$490 6,155 - - - - $490
6,155
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$104,951
Cost:
$489,186
$153,579 42,205 $(-58,479) (-18,275) $9,851 - $153,579
42,205
kWh
$(-58,479)
(-18,275)
MMBtu
$9,851
-
$
TOTAL IMPLEMENTED Savings:
$4,040
Cost:
$6,686
$3,406 42,205 $669 151 $(-35) - $3,406
42,205
kWh
$669
151
MMBtu
$(-35)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes