IAC Assessment: AS0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product POWDERED LAXATIVES
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 2,900,000 Pieces
Production Hrs. Annual 6,240
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $866,894 11,343,494 kWh $0.08
Natural Gas $117,448 27,285 MMBtu $4.30
TOTAL ENERGY COSTS $984,342
RECOMMENDED SAVINGS* $227,666 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,736
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,381
Cost:
$9,500
- - $7,381 1,717 - - -
-
kWh
$7,381
1,717
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,546
Cost:
$2,000
- - $5,546 1,290 - - -
-
kWh
$5,546
1,290
MMBtu
-
-
$
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$108,898
Cost:
$235,000
$100,245 1,466,295 $(-13,343) (-7,266) $21,996 - $100,245
1,466,295
kWh
$(-13,343)
(-7,266)
MMBtu
$21,996
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$61,773
Cost:
$50,500
$61,773 - - - - - $61,773
-
kWh
-
-
MMBtu
-
-
$
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$9,095
Cost:
$35,400
$9,095 118,992 - - - - $9,095
118,992
kWh
-
-
MMBtu
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$23,277
Cost:
$88,239
$23,277 304,807 - - - - $23,277
304,807
kWh
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$822
Cost:
$800
$822 10,844 - - - - $822
10,844
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,582
Cost:
-
$7,582 99,355 - - - - $7,582
99,355
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$141
Cost:
$180
$141 1,758 - - - - $141
1,758
kWh
-
-
MMBtu
-
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,151
Cost:
$5,265
$3,762 49,238 $(-611) (-142) - - $3,762
49,238
kWh
$(-611)
(-142)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$227,666
Cost:
$426,884
$206,697 2,051,289 $(-1,027) (-4,401) $21,996 - $206,697
2,051,289
kWh
$(-1,027)
(-4,401)
MMBtu
$21,996
-
$
TOTAL IMPLEMENTED Savings:
$62,736
Cost:
$51,480
$62,736 12,602 - - - - $62,736
12,602
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes