IAC logo
IAC Assessment: AS0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product GROUND BEEF
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pounds
Production Hrs. Annual 2,800
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,938 1,456,331 kWh $0.09
Natural Gas $16,367 3,731 MMBtu $4.39
TOTAL ENERGY COSTS $143,305
RECOMMENDED SAVINGS* $10,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,783
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,735
Cost:
$1,153
$1,735 19,930 - - - - $1,735
19,930
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,945
Cost:
-
$4,945 56,858 - - - - $4,945
56,858
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$610
Cost:
$250
$610 7,034 - - - - $610
7,034
kWh
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$720
Cost:
$1,584
$720 8,206 - - - - $720
8,206
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$201
Cost:
$500
- - $201 46 - - -
-
kWh
$201
46
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$964
Cost:
$463
- - $964 207 - - -
-
kWh
$964
207
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$196
Cost:
-
$227 2,638 - - $(-31) - $227
2,638
kWh
-
-
MMBtu
$(-31)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$138
Cost:
$272
$138 1,465 - - - - $138
1,465
kWh
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$195
Cost:
$236
$195 2,345 - - - - $195
2,345
kWh
-
-
MMBtu
-
-
$
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,019
Cost:
$1,005
$1,019 11,723 - - - - $1,019
11,723
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,723
Cost:
$5,463
$9,589 110,199 $1,165 253 $(-31) - $9,589
110,199
kWh
$1,165
253
MMBtu
$(-31)
-
$
TOTAL IMPLEMENTED Savings:
$8,783
Cost:
$2,374
$7,850 90,270 $964 207 $(-31) - $7,850
90,270
kWh
$964
207
MMBtu
$(-31)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes