IAC logo
IAC Assessment: AS0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product READY MIX CEMENT
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Tons
Production Hrs. Annual 3,120
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $494,622 4,595,252 kWh $0.11
Natural Gas $239,301 55,854 MMBtu $4.28
TOTAL ENERGY COSTS $733,923
RECOMMENDED SAVINGS* $76,754 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,154
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$341
Cost:
-
$366 3,517 - - $(-25) - $366
3,517
kWh
-
-
MMBtu
$(-25)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45
Cost:
$215
$45 293 - - - - $45
293
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,297
Cost:
$2,030
$1,297 12,016 - - - - $1,297
12,016
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,536
Cost:
$3,544
$2,536 23,447 - - - - $2,536
23,447
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,606
Cost:
-
$1,606 14,947 - - - - $1,606
14,947
kWh
-
-
MMBtu
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,145
Cost:
$300
$1,145 10,551 - - - - $1,145
10,551
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,374
Cost:
$4,199
$1,275 11,723 - - $3,099 - $1,275
11,723
kWh
-
-
MMBtu
$3,099
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,447
Cost:
$1,104
$8,447 78,253 - - - - $8,447
78,253
kWh
-
-
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,056
Cost:
$2,513
- - $4,056 948 - - -
-
kWh
$4,056
948
MMBtu
-
-
$
10: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$52,907
Cost:
$200,000
$59,407 410,023 $(-12,350) (-3,847) $5,850 - $59,407
410,023
kWh
$(-12,350)
(-3,847)
MMBtu
$5,850
-
$
TOTAL RECOMMENDED Savings:
$76,754
Cost:
$213,905
$76,124 564,770 $(-8,294) (-2,899) $8,924 - $76,124
564,770
kWh
$(-8,294)
(-2,899)
MMBtu
$8,924
-
$
TOTAL IMPLEMENTED Savings:
$10,154
Cost:
$9,773
$7,080 65,650 - - $3,074 - $7,080
65,650
kWh
-
-
MMBtu
$3,074
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes