IAC Assessment: AS0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1994
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 42,000
Annual Production 500,000 Pieces
Production Hrs. Annual 6,240
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $205,513 3,106,389 kWh $0.07
Natural Gas $98,688 22,941 MMBtu $4.30
TOTAL ENERGY COSTS $304,201
RECOMMENDED SAVINGS* $25,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,872
Cost:
$25,010
$11,872 179,367 - - $11,872
179,367
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,286
Cost:
$1,153
$2,286 34,584 - - $2,286
34,584
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$207
Cost:
$340
$207 3,224 - - $207
3,224
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,395
Cost:
$2,054
$2,395 36,342 - - $2,395
36,342
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$626
Cost:
$3,044
$626 9,379 - - $626
9,379
kWh
-
-
MMBtu
06: 2.2695 USE CASCADE SYSTEM OF RECIRCULATING DURING COLD WEATHER TO AVOID SUB-COOLING Savings:
$4,008
Cost:
$12,000
$4,008 60,668 - - $4,008
60,668
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$749
Cost:
$500
$749 11,430 - - $749
11,430
kWh
-
-
MMBtu
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,758
Cost:
$2,330
$1,758 12,016 - - $1,758
12,016
kWh
-
-
MMBtu
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,932
Cost:
$2,000
- - $1,932 449 -
-
kWh
$1,932
449
MMBtu
TOTAL RECOMMENDED Savings:
$25,833
Cost:
$48,431
$23,901 347,010 $1,932 449 $23,901
347,010
kWh
$1,932
449
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas