IAC logo
IAC Assessment: AS0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1994
Principal Product concrete
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 100,000
Annual Production 1,000,000 Tons
Production Hrs. Annual 4,160
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,578 4,659,144 kWh $0.06
TOTAL ENERGY COSTS $266,578
RECOMMENDED SAVINGS* $33,079 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,620
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,657
Cost:
$20,486
$10,657 186,401 $10,657
186,401
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,311
Cost:
-
$3,311 57,737 $3,311
57,737
kWh
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$491
Cost:
-
$491 8,499 $491
8,499
kWh
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,459
Cost:
$2,459
$1,459 7,327 $1,459
7,327
kWh
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$769
Cost:
$200
$769 13,482 $769
13,482
kWh
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,424
Cost:
$3,000
$1,424 24,912 $1,424
24,912
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,341
Cost:
$7,356
$2,341 41,032 $2,341
41,032
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$414
Cost:
$698
$414 7,327 $414
7,327
kWh
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,213
Cost:
$25,250
$12,213 - $12,213
-
kWh
TOTAL RECOMMENDED Savings:
$33,079
Cost:
$59,449
$33,079 346,717 $33,079
346,717
kWh
TOTAL IMPLEMENTED Savings:
$17,620
Cost:
$26,145
$17,620 289,859 $17,620
289,859
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage