IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Drive Bits
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 26,750
Annual Production 1,100,000 Pieces
Production Hrs. Annual 4,420
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,388 1,244,725 kWh $0.10
Natural Gas $16,447 2,959 MMBtu $5.56
TOTAL ENERGY COSTS $136,835
RECOMMENDED SAVINGS* $34,053 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,324
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,969
Cost:
$20,628
$10,969 126,612 - - $10,969
126,612
kWh
-
-
MMBtu
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,093
Cost:
$6,583
- - $2,093 374 -
-
kWh
$2,093
374
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,539
Cost:
$8,245
$7,539 75,909 - - $7,539
75,909
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,024
Cost:
-
$3,024 29,894 - - $3,024
29,894
kWh
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,891
Cost:
$10,900
$7,891 94,080 - - $7,891
94,080
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$667
Cost:
$500
$667 4,982 - - $667
4,982
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,123
Cost:
$260
$1,123 13,482 - - $1,123
13,482
kWh
-
-
MMBtu
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$747
Cost:
$480
$747 9,086 - - $747
9,086
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,053
Cost:
$47,596
$31,960 354,045 $2,093 374 $31,960
354,045
kWh
$2,093
374
MMBtu
TOTAL IMPLEMENTED Savings:
$20,324
Cost:
$19,885
$20,324 222,451 - - $20,324
222,451
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas