IAC logo
IAC Assessment: AS0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3769 - Space Vehicle Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 60,000
Annual Production 21,600 Pieces
Production Hrs. Annual 4,160
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $287,549 3,907,093 kWh $0.07
TOTAL ENERGY COSTS $287,549
RECOMMENDED SAVINGS* $71,445 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,677
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$42,045
Cost:
$63,900
$42,045 519,344 - - $42,045
519,344
kWh
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$22,768
Cost:
$58,000
$22,768 276,964 - - $22,768
276,964
kWh
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,451
Cost:
$5,634
$4,451 50,996 - - $4,451
50,996
kWh
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,119
Cost:
$1,380
$1,119 9,965 - - $1,119
9,965
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$704
Cost:
-
- - $704 - -
-
kWh
$704
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$358
Cost:
$1,305
$358 3,517 - - $358
3,517
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$71,445
Cost:
$130,219
$70,741 860,786 $704 - $70,741
860,786
kWh
$704
-
$
TOTAL IMPLEMENTED Savings:
$48,677
Cost:
$72,219
$47,973 583,822 $704 - $47,973
583,822
kWh
$704
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes