IAC logo
IAC Assessment: AS0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product HVAC Metal Air Diffusers
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 200,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $440,895 4,672,040 kWh $0.09
Natural Gas $150,681 28,833 MMBtu $5.23
TOTAL ENERGY COSTS $591,576
RECOMMENDED SAVINGS* $105,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,900
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$19,900
Cost:
$2,900
$19,900 218,933 - - $19,900
218,933
kWh
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$4,212
Cost:
$2,834
$4,212 40,739 - - $4,212
40,739
kWh
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$855
Cost:
$200
$855 9,379 - - $855
9,379
kWh
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,243
Cost:
$9,227
$14,243 152,696 - - $14,243
152,696
kWh
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,179
Cost:
-
$4,179 44,256 - - $4,179
44,256
kWh
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,112
Cost:
$18,838
$6,112 63,306 - - $6,112
63,306
kWh
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$784
Cost:
$1,250
$784 9,965 - - $784
9,965
kWh
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,992
Cost:
$53,617
$24,992 269,343 - - $24,992
269,343
kWh
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,155
Cost:
$1,511
$1,155 12,603 - - $1,155
12,603
kWh
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,139
Cost:
$825
$1,139 14,654 - - $1,139
14,654
kWh
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$462
Cost:
$499
$462 4,689 - - $462
4,689
kWh
-
-
$
12: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$27,344
Cost:
$50,250
- - $27,344 - -
-
kWh
$27,344
-
$
TOTAL RECOMMENDED Savings:
$105,377
Cost:
$141,951
$78,033 840,563 $27,344 - $78,033
840,563
kWh
$27,344
-
$
TOTAL IMPLEMENTED Savings:
$19,900
Cost:
$2,900
$19,900 218,933 - - $19,900
218,933
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes