IAC Assessment: AS0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Electronic Products
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $5,000,000-$10,000,000
# of Employees 575
Plant Area (Sq.Ft.) 105,000
Annual Production 500,000 Pieces
Production Hrs. Annual 5,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,955 5,310,082 kWh $0.04
Electricity Demand $79,071 9,924 kW-months/year $7.97
TOTAL ENERGY COSTS $315,026
RECOMMENDED SAVINGS* $15,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,921
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,627
Cost:
$3,381
$1,005 33,118 $1,622 150 - - $1,005
33,118
kWh
$1,622
150
kW-months/year
-
-
lb
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$145
Cost:
$137
$145 4,689 - - - - $145
4,689
kWh
-
-
kW-months/year
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$938
Cost:
-
$397 13,189 $541 50 - - $397
13,189
kWh
$541
50
kW-months/year
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$596
Cost:
$560
$252 8,499 $344 32 - - $252
8,499
kWh
$344
32
kW-months/year
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,634
Cost:
$10,934
$1,024 35,170 $1,610 149 - - $1,024
35,170
kWh
$1,610
149
kW-months/year
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$577
Cost:
$975
$577 19,050 - - - - $577
19,050
kWh
-
-
kW-months/year
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$8,000
Cost:
$19,750
- - - - $8,000 50 -
-
kWh
-
-
kW-months/year
$8,000
50
lb
TOTAL RECOMMENDED Savings:
$15,517
Cost:
$35,737
$3,400 113,715 $4,117 381 $8,000 50 $3,400
113,715
kWh
$4,117
381
kW-months/year
$8,000
50
lb
TOTAL IMPLEMENTED Savings:
$14,921
Cost:
$35,177
$3,148 105,216 $3,773 349 $8,000 50 $3,148
105,216
kWh
$3,773
349
kW-months/year
$8,000
50
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)