Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1996 |
Principal Product | Flexible Packaging Materials |
NAICS | n/a |
SIC | 2671 - Paper Coated & Laminated, Packaging |
Sales | $10,000,000-$50,000,000 |
# of Employees | 106 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 5,150 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $416,475 | 6,445,194 | kWh | $0.06 |
Electricity Demand | $29,176 | 15,950 | kW-months/year | $1.83 |
TOTAL ENERGY COSTS | $472,654 | |||
RECOMMENDED SAVINGS* | $32,193 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,089 Cost: - |
$1,033 | 14,947 | $56 | 29 | - | - | - | - | - | - | - | - |
$1,033 14,947 kWh |
$56 29 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,086 Cost: $9,303 |
$2,895 | 41,911 | $191 | 98 | - | - | - | - | - | - | - | - |
$2,895 41,911 kWh |
$191 98 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,012 Cost: $2,346 |
$3,795 | 55,100 | $217 | 111 | - | - | - | - | - | - | - | - |
$3,795 55,100 kWh |
$217 111 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,505 Cost: $3,920 |
$2,153 | 31,067 | $352 | 180 | - | - | - | - | - | - | - | - |
$2,153 31,067 kWh |
$352 180 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,630 Cost: - |
- | - | - | - | - | - | $230 | 14,400 | - | - | $2,400 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$230 14,400 lb |
- - $ |
$2,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $13,920 Cost: $19,750 |
- | - | - | - | - | - | $13,920 | 706,667 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$13,920 706,667 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $4,951 Cost: $3,000 |
- | - | - | - | $2,381 | 467,327 | - | - | $2,570 | - | - | - |
- - kWh |
- - kW-months/year |
$2,381 467,327 Tgal |
- - lb |
$2,570 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,193 Cost: $38,319 |
$9,876 | 143,025 | $816 | 418 | $2,381 | 467,327 | $14,150 | 721,067 | $2,570 | - | $2,400 | - | $9,876 143,025 kWh |
$816 418 kW-months/year |
$2,381 467,327 Tgal |
$14,150 721,067 lb |
$2,570 - $ |
$2,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production |