IAC logo
IAC Assessment: AS0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Garden and Lawn Components
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 120,000
Annual Production 900 Thousand Feet
Production Hrs. Annual 8,136
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,527 2,380,422 kWh $0.06
Electricity Demand $15,608 5,338 kW-months/year $2.92
TOTAL ENERGY COSTS $165,235
RECOMMENDED SAVINGS* $34,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$6,963
Cost:
$450
$6,023 97,890 $940 322 - - $6,023
97,890
kWh
$940
322
kW-months/year
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,024
Cost:
$8,681
$4,618 75,029 $406 139 - - $4,618
75,029
kWh
$406
139
kW-months/year
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,509
Cost:
$750
$1,509 24,619 - - - - $1,509
24,619
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$258
Cost:
$510
$242 3,810 $16 5 - - $242
3,810
kWh
$16
5
kW-months/year
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,187
Cost:
-
$2,044 33,118 $143 49 - - $2,044
33,118
kWh
$143
49
kW-months/year
-
-
Tgal
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,089
Cost:
$5,005
$7,528 122,216 $561 192 - - $7,528
122,216
kWh
$561
192
kW-months/year
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,936
Cost:
-
$4,597 74,736 $339 116 - - $4,597
74,736
kWh
$339
116
kW-months/year
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,190
Cost:
$1,750
$1,112 18,171 $78 27 - - $1,112
18,171
kWh
$78
27
kW-months/year
-
-
Tgal
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,295
Cost:
$4,550
$1,823 29,601 $472 162 - - $1,823
29,601
kWh
$472
162
kW-months/year
-
-
Tgal
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$606
Cost:
$2,080
$606 9,965 - - - - $606
9,965
kWh
-
-
kW-months/year
-
-
Tgal
11: 3.4151 MINIMIZE WATER USAGE Savings:
$1,822
Cost:
$3,000
- - - - $1,822 813,600 -
-
kWh
-
-
kW-months/year
$1,822
813,600
Tgal
TOTAL RECOMMENDED Savings:
$34,879
Cost:
$26,776
$30,102 489,155 $2,955 1,012 $1,822 813,600 $30,102
489,155
kWh
$2,955
1,012
kW-months/year
$1,822
813,600
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal