IAC logo
IAC Assessment: AS0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Pasta Food Products
NAICS n/a
SIC 2098 - Macaroni And Spaghetti
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 300,000
Annual Production 43,500 Tons
Production Hrs. Annual 8,568
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $762,323 15,939,332 kWh $0.05
Electricity Demand $176,820 77,852 kW-months/year $2.27
TOTAL ENERGY COSTS $992,520
RECOMMENDED SAVINGS* $108,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,241
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,604
Cost:
-
$1,504 32,239 $100 45 - - $1,504
32,239
kWh
$100
45
kW-months/year
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$18,978
Cost:
$14,977
$17,438 379,836 $1,540 560 - - $17,438
379,836
kWh
$1,540
560
kW-months/year
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,295
Cost:
$1,350
$2,295 49,238 - - - - $2,295
49,238
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,307
Cost:
$9,177
$6,930 148,593 $377 170 - - $6,930
148,593
kWh
$377
170
kW-months/year
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,240
Cost:
$5,343
$2,021 43,376 $219 99 - - $2,021
43,376
kWh
$219
99
kW-months/year
-
-
Tgal
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$63,244
Cost:
$50,000
$58,508 1,253,224 $4,736 2,136 - - $58,508
1,253,224
kWh
$4,736
2,136
kW-months/year
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,003
Cost:
-
$8,414 180,246 $589 266 - - $8,414
180,246
kWh
$589
266
kW-months/year
-
-
Tgal
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$391
Cost:
$320
$391 8,499 - - - - $391
8,499
kWh
-
-
kW-months/year
-
-
Tgal
09: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,648
Cost:
$30
- - - - $1,648 679,100 -
-
kWh
-
-
kW-months/year
$1,648
679,100
Tgal
10: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$330
Cost:
$30
- - - - $330 135,820 -
-
kWh
-
-
kW-months/year
$330
135,820
Tgal
11: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,041
Cost:
$1,780
- - - - $1,041 428,919 -
-
kWh
-
-
kW-months/year
$1,041
428,919
Tgal
TOTAL RECOMMENDED Savings:
$108,081
Cost:
$83,007
$97,501 2,095,251 $7,561 3,276 $3,019 1,243,839 $97,501
2,095,251
kWh
$7,561
3,276
kW-months/year
$3,019
1,243,839
Tgal
TOTAL IMPLEMENTED Savings:
$85,241
Cost:
$66,817
$75,946 1,633,060 $6,276 2,696 $3,019 1,243,839 $75,946
1,633,060
kWh
$6,276
2,696
kW-months/year
$3,019
1,243,839
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal