Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1996 |
Principal Product | Laminants PC Boards |
NAICS | n/a |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 78,000 |
Annual Production | 15,000 Thousand Feet |
Production Hrs. Annual | 8,400 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $520,899 | 11,399,766 | kWh | $0.05 |
Electricity Demand | $177,903 | 59,896 | kW-months/year | $2.97 |
Natural Gas | $197,959 | 51,371 | MMBtu | $3.85 |
TOTAL ENERGY COSTS | $896,761 | |||
RECOMMENDED SAVINGS* | $87,153 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,755 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,232 Cost: - |
$2,767 | 94,959 | $1,465 | 135 | - | - | - | - | - | - |
$2,767 94,959 kWh |
$1,465 135 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,782 Cost: $430 |
$6,396 | 219,226 | $3,386 | 313 | - | - | - | - | - | - |
$6,396 219,226 kWh |
$3,386 313 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,593 Cost: $500 |
$1,042 | 35,756 | $551 | 51 | - | - | - | - | - | - |
$1,042 35,756 kWh |
$551 51 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $11,259 Cost: $9,718 |
$7,217 | 247,362 | $4,042 | 374 | - | - | - | - | - | - |
$7,217 247,362 kWh |
$4,042 374 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,328 Cost: $21,600 |
$12,638 | 433,470 | $6,690 | 619 | - | - | - | - | - | - |
$12,638 433,470 kWh |
$6,690 619 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $1,812 Cost: - |
$1,062 | 36,342 | $750 | 69 | - | - | - | - | - | - |
$1,062 36,342 kWh |
$750 69 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $23,483 Cost: $35,000 |
$13,955 | 474,502 | $9,528 | 881 | - | - | - | - | - | - |
$13,955 474,502 kWh |
$9,528 881 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,713 Cost: $10,089 |
$2,998 | 102,579 | $1,715 | 159 | - | - | - | - | - | - |
$2,998 102,579 kWh |
$1,715 159 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $950 Cost: $1,425 |
$950 | 28,429 | - | - | - | - | - | - | - | - |
$950 28,429 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $4,490 Cost: $1,200 |
- | - | - | - | $4,490 | 1,088 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,490 1,088 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4151 MINIMIZE WATER USAGE |
Savings: $5,511 Cost: $5,000 |
- | - | - | - | - | - | $3,657 | 1,510,996 | $1,854 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,657 1,510,996 Tgal |
$1,854 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $87,153 Cost: $84,962 |
$49,025 | 1,672,625 | $28,127 | 2,601 | $4,490 | 1,088 | $3,657 | 1,510,996 | $1,854 | - | $49,025 1,672,625 kWh |
$28,127 2,601 kW-months/year |
$4,490 1,088 MMBtu |
$3,657 1,510,996 Tgal |
$1,854 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,755 Cost: $36,630 |
$20,351 | 693,728 | $12,914 | 1,194 | $4,490 | 1,088 | - | - | - | - | $20,351 693,728 kWh |
$12,914 1,194 kW-months/year |
$4,490 1,088 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost |