IAC Assessment: AS0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Sports Equipment
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 500,000
Annual Production 1,825,000 Pieces
Production Hrs. Annual 3,332
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $624,242 9,015,534 kWh $0.07
Electricity Demand $24,858 24,858 kW-months/year $1.00
Electricity Fees $53,155 - $ -
Natural Gas $36,011 6,043 MMBtu $5.96
TOTAL ENERGY COSTS $775,697
RECOMMENDED SAVINGS* $118,252 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,551
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,219
Cost:
-
$3,059 62,134 $160 166 - - - - - - - - - - $3,059
62,134
kWh
$160
166
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,789
Cost:
$1,625
$2,468 50,117 $133 138 - - $21 12 - - - - $167 - $2,468
50,117
kWh
$133
138
kW-months/year
-
-
Tgal
$21
12
gal
-
-
lb
-
-
$
$167
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,704
Cost:
$21,700
$11,408 231,536 $1,296 673 - - - - - - - - - - $11,408
231,536
kWh
$1,296
673
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$4,699
Cost:
$3,600
$4,278 86,753 $421 218 - - - - - - - - - - $4,278
86,753
kWh
$421
218
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$319
Cost:
-
$270 5,569 $49 25 - - - - - - - - - - $270
5,569
kWh
$49
25
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$779
Cost:
$1,680
$739 14,947 $40 21 - - - - - - - - - - $739
14,947
kWh
$40
21
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,006
Cost:
$180
$2,635 53,341 $371 192 - - - - - - - - - - $2,635
53,341
kWh
$371
192
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,740
Cost:
$12,300
$5,426 110,199 $314 163 - - - - - - - - - - $5,426
110,199
kWh
$314
163
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,494
Cost:
$13,387
$5,539 112,251 $955 496 - - - - - - - - - - $5,539
112,251
kWh
$955
496
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
10: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$1,093
Cost:
$779
- - - - $1,093 387,500 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,093
387,500
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
11: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$17,366
Cost:
$4,500
- - - - $31 10,920 $4,080 12,000 - - - - $13,255 - -
-
kWh
-
-
kW-months/year
$31
10,920
Tgal
$4,080
12,000
gal
-
-
lb
-
-
$
$13,255
-
$
12: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$58,584
Cost:
$15,000
- - - - - - - - $54,912 - - - $3,672 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$54,912
-
lb
-
-
$
$3,672
-
$
13: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$1,460
Cost:
$50
- - - - - - - - - - $1,460 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$1,460
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$118,252
Cost:
$74,801
$35,822 726,847 $3,739 2,092 $1,124 398,420 $4,101 12,012 $54,912 - $1,460 - $17,094 - $35,822
726,847
kWh
$3,739
2,092
kW-months/year
$1,124
398,420
Tgal
$4,101
12,012
gal
$54,912
-
lb
$1,460
-
$
$17,094
-
$
TOTAL IMPLEMENTED Savings:
$27,551
Cost:
$38,622
$23,059 467,761 $2,844 1,545 - - $21 12 - - $1,460 - $167 - $23,059
467,761
kWh
$2,844
1,545
kW-months/year
-
-
Tgal
$21
12
gal
-
-
lb
$1,460
-
$
$167
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost