IAC logo
IAC Assessment: AS0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Golf Accessories
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 283
Plant Area (Sq.Ft.) 80,000
Annual Production 515,000 Pieces
Production Hrs. Annual 3,332
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,892 2,281,653 kWh $0.08
Electricity Demand $12,803 7,558 kW-months/year $1.69
Electricity Fees $14,428 - $ -
TOTAL ENERGY COSTS $222,918
RECOMMENDED SAVINGS* $241,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,454
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$410
Cost:
-
$373 7,620 $37 19 - - - - - - - - - - $373
7,620
kWh
$37
19
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,976
Cost:
$140
$2,609 53,048 $367 191 - - - - - - - - - - $2,609
53,048
kWh
$367
191
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$570
Cost:
$300
$471 9,672 $40 21 $7 7 - - - - - - $52 - $471
9,672
kWh
$40
21
kW-months/year
$7
7
gal
-
-
lb
-
-
$
-
-
$
$52
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,593
Cost:
$12,000
$7,855 159,437 $738 383 - - - - - - - - - - $7,855
159,437
kWh
$738
383
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$10,117
Cost:
$7,000
$9,146 185,522 $971 504 - - - - - - - - - - $9,146
185,522
kWh
$971
504
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,411
Cost:
$3,015
$1,339 27,257 $72 37 - - - - - - - - - - $1,339
27,257
kWh
$72
37
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,995
Cost:
$13,000
$4,379 88,804 $616 320 - - - - - - - - - - $4,379
88,804
kWh
$616
320
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,635
Cost:
$3,183
$1,400 28,429 $235 122 - - - - - - - - - - $1,400
28,429
kWh
$235
122
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$396
Cost:
$570
$376 7,620 $20 10 - - - - - - - - - - $376
7,620
kWh
$20
10
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.7145 INSTALL SKYLIGHTS Savings:
$1,207
Cost:
$1,200
$1,023 20,809 $184 96 - - - - - - - - - - $1,023
20,809
kWh
$184
96
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,037
Cost:
-
$1,835 37,222 $202 105 - - - - - - - - - - $1,835
37,222
kWh
$202
105
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,492
Cost:
$2,250
$1,384 28,136 $108 56 - - - - - - - - - - $1,384
28,136
kWh
$108
56
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
13: 3.5216 RECYCLE NONFERROUS DUST Savings:
$176
Cost:
-
- - - - - - $176 6,600 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$176
6,600
lb
-
-
$
-
-
$
-
-
$
14: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$205,047
Cost:
$15,000
$60,100 1,219,226 $8,489 4,407 - - - - $6,494 - $129,964 - - - $60,100
1,219,226
kWh
$8,489
4,407
kW-months/year
-
-
gal
-
-
lb
$6,494
-
$
$129,964
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$241,062
Cost:
$57,658
$92,290 1,872,802 $12,079 6,271 $7 7 $176 6,600 $6,494 - $129,964 - $52 - $92,290
1,872,802
kWh
$12,079
6,271
kW-months/year
$7
7
gal
$176
6,600
lb
$6,494
-
$
$129,964
-
$
$52
-
$
TOTAL IMPLEMENTED Savings:
$7,454
Cost:
$3,893
$6,593 133,939 $861 447 - - - - - - - - - - $6,593
133,939
kWh
$861
447
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost