Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1997 |
Principal Product | Golf Accessories |
NAICS | n/a |
SIC | 3949 - Sporting And Athletic Goods, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 283 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 515,000 Pieces |
Production Hrs. Annual | 3,332 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $185,892 | 2,281,653 | kWh | $0.08 |
Electricity Demand | $12,803 | 7,558 | kW-months/year | $1.69 |
Electricity Fees | $14,428 | - | $ | - |
TOTAL ENERGY COSTS | $222,918 | |||
RECOMMENDED SAVINGS* | $241,062 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,454 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $410 Cost: - |
$373 | 7,620 | $37 | 19 | - | - | - | - | - | - | - | - | - | - |
$373 7,620 kWh |
$37 19 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,976 Cost: $140 |
$2,609 | 53,048 | $367 | 191 | - | - | - | - | - | - | - | - | - | - |
$2,609 53,048 kWh |
$367 191 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $570 Cost: $300 |
$471 | 9,672 | $40 | 21 | $7 | 7 | - | - | - | - | - | - | $52 | - |
$471 9,672 kWh |
$40 21 kW-months/year |
$7 7 gal |
- - lb |
- - $ |
- - $ |
$52 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $8,593 Cost: $12,000 |
$7,855 | 159,437 | $738 | 383 | - | - | - | - | - | - | - | - | - | - |
$7,855 159,437 kWh |
$738 383 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $10,117 Cost: $7,000 |
$9,146 | 185,522 | $971 | 504 | - | - | - | - | - | - | - | - | - | - |
$9,146 185,522 kWh |
$971 504 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,411 Cost: $3,015 |
$1,339 | 27,257 | $72 | 37 | - | - | - | - | - | - | - | - | - | - |
$1,339 27,257 kWh |
$72 37 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,995 Cost: $13,000 |
$4,379 | 88,804 | $616 | 320 | - | - | - | - | - | - | - | - | - | - |
$4,379 88,804 kWh |
$616 320 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,635 Cost: $3,183 |
$1,400 | 28,429 | $235 | 122 | - | - | - | - | - | - | - | - | - | - |
$1,400 28,429 kWh |
$235 122 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $396 Cost: $570 |
$376 | 7,620 | $20 | 10 | - | - | - | - | - | - | - | - | - | - |
$376 7,620 kWh |
$20 10 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7145 INSTALL SKYLIGHTS |
Savings: $1,207 Cost: $1,200 |
$1,023 | 20,809 | $184 | 96 | - | - | - | - | - | - | - | - | - | - |
$1,023 20,809 kWh |
$184 96 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,037 Cost: - |
$1,835 | 37,222 | $202 | 105 | - | - | - | - | - | - | - | - | - | - |
$1,835 37,222 kWh |
$202 105 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,492 Cost: $2,250 |
$1,384 | 28,136 | $108 | 56 | - | - | - | - | - | - | - | - | - | - |
$1,384 28,136 kWh |
$108 56 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5216 RECYCLE NONFERROUS DUST |
Savings: $176 Cost: - |
- | - | - | - | - | - | $176 | 6,600 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$176 6,600 lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.512 CONDENSE OPERATION INTO ONE BUILDING |
Savings: $205,047 Cost: $15,000 |
$60,100 | 1,219,226 | $8,489 | 4,407 | - | - | - | - | $6,494 | - | $129,964 | - | - | - |
$60,100 1,219,226 kWh |
$8,489 4,407 kW-months/year |
- - gal |
- - lb |
$6,494 - $ |
$129,964 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $241,062 Cost: $57,658 |
$92,290 | 1,872,802 | $12,079 | 6,271 | $7 | 7 | $176 | 6,600 | $6,494 | - | $129,964 | - | $52 | - | $92,290 1,872,802 kWh |
$12,079 6,271 kW-months/year |
$7 7 gal |
$176 6,600 lb |
$6,494 - $ |
$129,964 - $ |
$52 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,454 Cost: $3,893 |
$6,593 | 133,939 | $861 | 447 | - | - | - | - | - | - | - | - | - | - | $6,593 133,939 kWh |
$861 447 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |