IAC Assessment: AS0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Pressure Sensitive Labels
NAICS n/a
SIC 2641 -
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 58,000
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 4,950
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,802 1,675,264 kWh $0.06
Electricity Demand $11,851 4,272 kW-months/year $2.77
Electricity Fees $9,628 - $ -
TOTAL ENERGY COSTS $118,281
RECOMMENDED SAVINGS* $55,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,732
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$13,061
Cost:
$18,500
$7,110 182,005 $5,951 529 - - - - - - - - $7,110
182,005
kWh
$5,951
529
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,941
Cost:
$17
$1,143 29,308 $798 71 - - - - - - - - $1,143
29,308
kWh
$798
71
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,567
Cost:
$1,440
$1,567 40,152 - - - - - - - - - - $1,567
40,152
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,154
Cost:
$224
$563 14,361 $591 53 - - - - - - - - $563
14,361
kWh
$591
53
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$464
Cost:
$621
$264 6,741 $200 18 - - - - - - - - $264
6,741
kWh
$200
18
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$313
Cost:
$300
$213 5,569 $100 9 - - - - - - - - $213
5,569
kWh
$100
9
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$9,346
Cost:
$14,000
$(-16) 293 - - $10,584 1,980 $(-442) - - - $(-780) - $(-16)
293
kWh
-
-
kW-months/year
$10,584
1,980
gal
$(-442)
-
$
-
-
$
$(-780)
-
$
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,344
Cost:
$34
- - - - - - - - $1,344 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$1,344
-
$
-
-
$
09: 4.4520 ELIMINATE SHIFT Savings:
$26,201
Cost:
$100
$551 14,068 - - - - $25,650 - - - - - $551
14,068
kWh
-
-
kW-months/year
-
-
gal
$25,650
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,391
Cost:
$35,236
$11,395 292,497 $7,640 680 $10,584 1,980 $25,208 - $1,344 - $(-780) - $11,395
292,497
kWh
$7,640
680
kW-months/year
$10,584
1,980
gal
$25,208
-
$
$1,344
-
$
$(-780)
-
$
TOTAL IMPLEMENTED Savings:
$38,732
Cost:
$16,385
$2,929 75,615 $791 71 $10,584 1,980 $25,208 - - - $(-780) - $2,929
75,615
kWh
$791
71
kW-months/year
$10,584
1,980
gal
$25,208
-
$
-
-
$
$(-780)
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost