Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1997 |
Principal Product | Daily Newspapers and Advertising Inserts |
NAICS | n/a |
SIC | 2711 - Newspapers |
Sales | $500,000-$1,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 32,500 |
Annual Production | 700,000 Pieces |
Production Hrs. Annual | 7,462 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $355,709 | 10,714,830 | kWh | $0.03 |
Electricity Demand | $176,071 | 25,083 | kW-months/year | $7.02 |
Electricity Fees | $131,446 | - | $ | - |
TOTAL ENERGY COSTS | $685,679 | |||
RECOMMENDED SAVINGS* | $770,799 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,777 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,343 Cost: $35 |
$4,046 | 119,578 | $1,297 | 192 | - | - | - | - | - | - | - | - | - | - | - | - |
$4,046 119,578 kWh |
$1,297 192 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $12,065 Cost: $960 |
$9,130 | 269,930 | $2,935 | 434 | - | - | - | - | - | - | - | - | - | - | - | - |
$9,130 269,930 kWh |
$2,935 434 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $2,947 Cost: $935 |
$2,025 | 60,668 | $658 | 97 | - | - | $30 | 26 | - | - | - | - | - | - | $234 | - |
$2,025 60,668 kWh |
$658 97 kW-months/year |
- - Tgal |
$30 26 gal |
- - lb |
- - $ |
- - $ |
$234 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $21,756 Cost: $26,277 |
$18,267 | 540,152 | $3,489 | 516 | - | - | - | - | - | - | - | - | - | - | - | - |
$18,267 540,152 kWh |
$3,489 516 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $22,979 Cost: $34,500 |
$17,401 | 514,654 | $5,578 | 825 | - | - | - | - | - | - | - | - | - | - | - | - |
$17,401 514,654 kWh |
$5,578 825 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $3,153 Cost: $1,070 |
$2,718 | 80,305 | $435 | 64 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,718 80,305 kWh |
$435 64 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES |
Savings: $46,235 Cost: $14,000 |
$46,235 | 1,531,067 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$46,235 1,531,067 kWh |
- - kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,188 Cost: $1,500 |
$2,005 | 59,203 | $183 | 27 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,005 59,203 kWh |
$183 27 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $349 Cost: $600 |
$306 | 6,155 | $43 | 6 | - | - | - | - | - | - | - | - | - | - | - | - |
$306 6,155 kWh |
$43 6 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,124 Cost: $35,959 |
$11,100 | 326,202 | $3,024 | 447 | - | - | - | - | - | - | - | - | - | - | - | - |
$11,100 326,202 kWh |
$3,024 447 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,640 Cost: $47,883 |
$11,763 | 344,373 | $2,877 | 426 | - | - | - | - | - | - | - | - | - | - | - | - |
$11,763 344,373 kWh |
$2,877 426 kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $830 Cost: $200 |
- | - | - | - | $830 | 262,800 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$830 262,800 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $50,790 Cost: $14,000 |
$(-50) | 2,052 | - | - | - | - | $55,760 | 18,040 | - | - | $(-1,320) | - | - | - | $(-3,600) | - |
$(-50) 2,052 kWh |
- - kW-months/year |
- - Tgal |
$55,760 18,040 gal |
- - lb |
$(-1,320) - $ |
- - $ |
$(-3,600) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $571,000 Cost: $750,000 |
- | - | - | - | - | - | - | - | $158,000 | - | $413,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - gal |
$158,000 - lb |
$413,000 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE |
Savings: $2,400 Cost: $5,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $2,400 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - gal |
- - lb |
- - $ |
$2,400 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $770,799 Cost: $932,919 |
$124,946 | 3,854,339 | $20,519 | 3,034 | $830 | 262,800 | $55,790 | 18,066 | $158,000 | - | $411,680 | - | $2,400 | - | $(-3,366) | - | $124,946 3,854,339 kWh |
$20,519 3,034 kW-months/year |
$830 262,800 Tgal |
$55,790 18,066 gal |
$158,000 - lb |
$411,680 - $ |
$2,400 - $ |
$(-3,366) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,777 Cost: $1,135 |
$2,025 | 60,668 | $658 | 97 | $830 | 262,800 | $30 | 26 | - | - | - | - | - | - | $234 | - | $2,025 60,668 kWh |
$658 97 kW-months/year |
$830 262,800 Tgal |
$30 26 gal |
- - lb |
- - $ |
- - $ |
$234 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |