Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1997 |
Principal Product | Corrugated Containers |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 185 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 840,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $261,035 | 4,687,866 | kWh | $0.06 |
Electricity Demand | $24,900 | 9,528 | kW-months/year | $2.61 |
Electricity Fees | $20,278 | - | $ | - |
Natural Gas | $193,444 | 45,207 | MMBtu | $4.28 |
TOTAL ENERGY COSTS | $520,219 | |||
RECOMMENDED SAVINGS* | $154,500 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,722 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | By-product Production | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $16,012 Cost: $11,499 |
$13,116 | 240,621 | $2,896 | 460 | - | - | - | - | - | - | - | - |
$13,116 240,621 kWh |
$2,896 460 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,445 Cost: $8,160 |
$5,279 | 97,011 | $1,166 | 185 | - | - | - | - | - | - | - | - |
$5,279 97,011 kWh |
$1,166 185 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,839 Cost: $12 |
$1,506 | 27,550 | $333 | 53 | - | - | - | - | - | - | - | - |
$1,506 27,550 kWh |
$333 53 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,907 Cost: $3,500 |
$2,002 | 36,635 | $442 | 70 | - | - | $(-537) | 125 | - | - | - | - |
$2,002 36,635 kWh |
$442 70 kW-months/year |
- - $ |
$(-537) 125 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,182 Cost: $3,000 |
$891 | 16,413 | $291 | 46 | - | - | - | - | - | - | - | - |
$891 16,413 kWh |
$291 46 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,084 Cost: $9,599 |
$2,270 | 41,618 | $814 | 129 | - | - | - | - | - | - | - | - |
$2,270 41,618 kWh |
$814 129 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $766 Cost: $1,350 |
$637 | 11,723 | $129 | 21 | - | - | - | - | - | - | - | - |
$637 11,723 kWh |
$129 21 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,753 Cost: - |
$2,255 | 41,325 | $498 | 79 | - | - | - | - | - | - | - | - |
$2,255 41,325 kWh |
$498 79 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4152 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT |
Savings: $665 Cost: - |
- | - | - | - | - | - | - | - | $665 | 262,800 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$665 262,800 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $940 Cost: $500 |
- | - | - | - | - | - | - | - | $940 | 371,800 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$940 371,800 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $25,407 Cost: $200 |
- | - | - | - | $25,407 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$25,407 - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $93,500 Cost: $750 |
- | - | - | - | - | - | - | - | - | - | $93,500 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
$93,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $154,500 Cost: $38,570 |
$27,956 | 512,896 | $6,569 | 1,043 | $25,407 | - | $(-537) | 125 | $1,605 | 634,600 | $93,500 | - | $27,956 512,896 kWh |
$6,569 1,043 kW-months/year |
$25,407 - $ |
$(-537) 125 MMBtu |
$1,605 634,600 Tgal |
$93,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,722 Cost: $24,610 |
$17,783 | 326,202 | $4,334 | 688 | - | - | - | - | $1,605 | 634,600 | - | - | $17,783 326,202 kWh |
$4,334 688 kW-months/year |
- - $ |
- - MMBtu |
$1,605 634,600 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||